Laserfiche WebLink
PHONE 285-2400 <br /> tt ttcC CABLE AD�D6RESSS: TIMOIL <br /> SEATTLE e 1R fIFM-TI�3-8036 <br /> TACOMA " `-RI41T Sty'` <br /> STOCOND NJ <br /> �E TIME OIL CO . 27 pyLOS ANGELES s _.-.r L / f i l eI 2737 WEST COMMODORE WAY SEATTLE,WA 98199-1233 <br /> PFOOUCTs P.O.BOX 24447 SEATTLE,WA 98124-0447 <br /> iWETE5TE0 nE <br /> December 21, 1995 <br /> San Joaquin County Health Services <br /> Environmental Health Division <br /> Attn. Pamela S. Violett, REHS <br /> PO Box 2009 <br /> Stockton, CA 95201-2009 <br /> Re: Temporary Cessation of Operations <br /> Time Oil Co. Stockton Terminal <br /> 3015 Navy Drive, Stockton, CA <br /> Dear Ms. Violett: <br /> Because of the lack of current business activity at Time Oil Co.'s storage terminal in <br /> Stockton, CA, the company has determined that it is in its best interest to temporarily <br /> cease operations at the facility. In spite of this action, the company is continuing to <br /> explore its long term options for the facility. The terminal was used primarily for storage <br /> of petroleum products in the form of gasolines, distillates and fuel additives. <br /> The following items address specific elements of terminal operations: <br /> Meters - All meters at the loading rack will be locked and sealed. If the facility re-opens <br /> at some future date, the meters will be calibrated prior to returning to operation. <br /> Tanks - All customers have been given notice to remove their products from storage by <br /> the end of business on December 31, 1995. All storage tank input and discharge <br /> valves will be locked once the tanks are empty of product. <br /> Vapor Recovery Unit - <br /> The vapor recovery unit will operate during the storage tank draw down period <br /> as throughput levels allow. At that time, the vapor recovery unit will be placed <br /> in inactive service. If the facility re-opens at a future date, a source test will be <br /> scheduled once adequate throughput levels are established. <br /> Personnel - <br /> Some of the terminal employees will be furloughed during the period of <br /> cessation of operations. If the facility re-opens at a future date, training records <br /> will be made available upon request and training courses will resume at that time. <br />