Laserfiche WebLink
yes 10 Comment <br /> Contingency Plan and Emergency Procedures - Continued <br /> Has the plan been reviewed and immediately <br /> amended whenever: (67143-/265.54-] <br /> (b/a) Applicable regulations are <br /> revised? _ <br /> (c/b) The plan fails in an emergency? <br /> (d/c) Facility changes require it? <br /> (e/d) The list of emergency <br /> coordinators changes? _ <br /> (f/e) The list of emergency equipment <br /> changes? <br /> Is there at all times at least one <br /> employee at the facility, or close by and <br /> on call, designated as EC, who is <br /> thoroughly familiar with all facility <br /> operations, wastes, records, layout, <br /> and emergency procedures, who has <br /> authority to commit the resources to <br /> carry out the contingency plan? <br /> [67144/265. 55] _ <br /> If an emergency has occurred at this <br /> facility, did the EC comply with all <br /> required emergency procedures? <br /> [67145/265. 56] _ <br /> Page 14 <br />