Laserfiche WebLink
Yes Imo Comment <br /> Exports of RCRA Hazardous Waste <br /> Exports of RCRA H.W. are prohibited <br /> unless: [-/262. 52-] <br /> (a) Notification (262 . 53) has been <br /> provided? _ <br /> (b) The receiving country has <br /> consented to accept the waste? _ <br /> (c) A copy of the EPA Acknowledgment <br /> of Consent accompanies the shipment, <br /> and is attached to the manifest or <br /> shipping paper? _ <br /> (d) The H.W. shipment conforms to the <br /> receiving country's written terms in <br /> the EPA acknowledgment of Consent? <br /> Did the primary exporter of H.W. notify <br /> the EPA each calendar year of intended <br /> exports? [-/262 . 53 (a) ] <br /> Was the notification at least 60 days <br /> before the intended date of the <br /> initial off-site shipment for the <br /> calendar year? [-/262 . 53 (a) ] <br /> Did the notice signed by the primary <br /> exporter include his name and address <br /> and the following information, by <br /> consignee, for each H.W. type: <br /> (-/262 . 53 (a) (1) , (2) -] <br /> (i) A description of the H.W. , <br /> the EPA waste identification no. and <br /> the DoT shipping description (in <br /> 40 CFR 171-177) ? <br /> (ii) The estimated frequency and <br /> time span of exportation? _ <br /> (iii) The estimated total quantity? _ <br /> (iv) All points of entry to and <br /> departure from each foreign country the <br /> H.W. will pass through? — _ <br /> (v) How the waste will be <br /> transported (type of vehicles and <br /> containers) ? — — <br /> (vi) A description of how the waste <br /> will be treated, stored, or disposed of <br /> in the receiving country? _ _ — <br /> (vii) The name and site address of <br /> the foreign consignee(s) ? _ _ <br /> (viii) The name of each country the <br /> H.W. will pass through, for how long it <br /> will remain there, and how it will be <br /> handled during that time? _ <br /> Page 16 <br />