My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NOWELL
>
26200
>
2200 - Hazardous Waste Program
>
PR0513888
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2019 11:43:55 AM
Creation date
11/1/2018 1:17:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0513888
PE
2220
FACILITY_ID
FA0009531
FACILITY_NAME
UFP Thornton LLC
STREET_NUMBER
26200
STREET_NAME
NOWELL
STREET_TYPE
Rd
City
Thornton
Zip
95686
CURRENT_STATUS
01
SITE_LOCATION
26200 Nowell Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\NOWELL\26200\PR0513888\COMPLIANCE INFO 1989 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 1989 - 2015
QuestysRecordDate
11/21/2017 12:29:48 AM
QuestysRecordID
3732620
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Yes No Comment <br /> 90 Day Accumulation in Tanks cont. <br /> (Section 66262.34) <br /> Is the tank exempt from this article because it <br /> serves only as part of a secondary containment <br /> system? [66265.190(b) ] <br /> If the answer is yes, for all HW tanks, to either of the two preceding questions, then <br /> skip pages 8 through 16, since they are not applicable. <br /> Are HW or treatment reagents placed in tams so <br /> they do not cause the tank, ancillary equipment or <br /> the secondary containment system to rupture, <br /> corrode, leak, or otherwise fail? [66265.194(x) ] <br /> Are controls and practices used to prevent spills <br /> and overflows, including: [66265.194(b)-] <br /> (1) spill prevention controls (e.g. , check <br /> valves and dry discount couplings)? <br /> (2) Overfill prevention controls (e.g. , level <br /> sensing devices, high level alarm, automatic <br /> feed cutoff, or bypass to a standby tank)? <br /> (3) Sufficient freeboard in uncovered tanks to <br /> prevent overtopping by wave or wind action or <br /> by precipitation? <br /> If a leak or spill has occurred, was 66265.196 <br /> complied with (see page 9)? [66265.194(c) <br /> Does transfer or storage of HW in tanks comply <br /> with 66265.17(b)? [66265.194(d) ] <br /> Are daily inspections done for the following: <br /> [66265.195(x)--] <br /> (1) Discharge control equipment (e.g. , feed <br /> cutoff, bypass, and drainage systems)? <br /> (2) Corrosion or releases of waste in the above <br /> ground portions? <br /> (3) Data gathered fraL monitoring and leak <br /> detection equipment (e.g. , pressure and <br /> tjer rature gauges, monitoring wells)? <br /> (4) Construction materials and area surrounding <br /> tank and secondary containment for erosion or <br /> signs of releases (e.g. , wet spots, dead <br /> vegetation)? <br /> (4) For uncovered tanks, the level of waste to <br /> comply with 66265.194(b) (3)? <br /> Are cathodic protection systems inspected six <br /> months after initial installation and then <br /> annually? [66265.195(b) (1) <br /> Revised 7/15/91 page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.