My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NOWELL
>
26200
>
2200 - Hazardous Waste Program
>
PR0513888
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2019 11:43:55 AM
Creation date
11/1/2018 1:17:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0513888
PE
2220
FACILITY_ID
FA0009531
FACILITY_NAME
UFP Thornton LLC
STREET_NUMBER
26200
STREET_NAME
NOWELL
STREET_TYPE
Rd
City
Thornton
Zip
95686
CURRENT_STATUS
01
SITE_LOCATION
26200 Nowell Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\NOWELL\26200\PR0513888\COMPLIANCE INFO 1989 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 1989 - 2015
QuestysRecordDate
11/21/2017 12:29:48 AM
QuestysRecordID
3732620
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jun . 2 - 2004 12: 0 0 P M W 0 t Environmental 8 3 2-5 15 2 N o - 2 3 2 6 P • 4 <br /> Standard Schedule of Rates <br /> December 31,2003 it)December 31,2004 <br /> Personnel Catezory Hourly Billing Rate <br /> AdministrativeAssistant.................... ................................................ ......................... ...............................................S 40.00 <br /> *Technician I.................................................................................................................................................................S 45M <br /> *Technician 11....................................... .........................................................................................................................S 59.00 <br /> *Technician III............ ................................................... ... ................................................... S 65.00 <br /> *171eld SupervLwr.......................................................................................................... ................................................S 75.00 <br /> *Equipmon(Opendtor......................................................................................................................................................S 68.00 <br /> StaffEnvironmental Specialist..........................................................I...........................................................................S 75.00 <br /> Senior Environmental Specialist................. ........... .......................................................................... ...S 85.00 <br /> Project/Oporations Manager.........................................................................................................................................3 95-00 <br /> RegisteredProfessional.................................................................................. .............................................................$ 125.00 <br /> Labor charges start and end at our Tracy facility. A minimum of 4 hours is charged for personnel reporting to a project site,and <br /> after 4 hours work,the minimum billing is 8 hours.(Rate Schedule is based on a non-prevailing wage rate scale) <br /> *The following table depicts work days other than straight time,and the allocated percentage increase for rates: <br /> Work Day Percentage Increase Other Direct Costs <br /> Urgent Response,<24 hour notice 1.5 Portal to Portal <br /> Holiday Work 1.75 Portal to Portal <br /> Swing and Graveyard Shift 1.25 Portal to Portal <br /> Weekend/Overtime Work 1.25 Portal to Portal <br /> Equivment and Materials <br /> Description Unit Unit Cost) <br /> 1. Pick-Up Truck(1/2 Ton) Day $85.00 <br /> 2. Pick-UpTruck(I Ton) Day $125.00 <br /> 3. Combustible Gas Meter(Gastech 1314) Day $50.00 <br /> 4. Pressure Washer(3000 psi 3-5gpm) Day $350.00 <br /> 5. 1"Double Diaphram.Pump whose Day $325.00 <br /> & Small Power Tools Day $50.00 <br /> 7. NEPA Vac Day $75.00 <br /> 8. Air Monitoring Equipment,Personnel Day $100.00 <br /> 9. PPL Level (C) Manday $65.00 <br /> 10. Traffic Control Equipment Day $75.00 <br /> 11. Drum Vac, Air Compressor Day $280.00 <br /> 12. Drum Vac,Electric Day $100.00 <br /> 13. 5 'ron Dumpbed Day $180.00 <br /> 14. Backhoe(416 B Cat) Day $350.00 <br /> 15. Fxcavator Day $750.00 <br /> Equipment rates identified above, include fuel and maintenance costs. Other direct Costs and materials shall be charged plus <br /> 10%Overhead and 10%profit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.