My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
334
>
2200 - Hazardous Waste Program
>
PR0513852
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2021 4:12:20 PM
Creation date
11/1/2018 1:48:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0513852
PE
2220
FACILITY_ID
FA0003714
FACILITY_NAME
LACHHAR CHEVRON*
STREET_NUMBER
334
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26115041
CURRENT_STATUS
02
SITE_LOCATION
334 E MAIN ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\334\PR0513852\COMPLIANCE INFO PRE 2015.PDF
QuestysFileName
COMPLIANCE INFO PRE 2015
QuestysRecordDate
12/24/2016 12:00:10 AM
QuestysRecordID
3299303
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, Po ianknology <br />SITE SAFETY CHECKLIST, SERVICE AGREEMENT & OPERATOR VERIFICATION FORM <br />Site Nime: <br />Address: <br />✓ POST-TEST PROCEDURES <br />W.O. <br />❑ Discuss safety procedures with site personnel. <br />1. ❑ Remove all "Lockoul/Tagout" devices. <br />2. <br />❑ Prior to fuel deliveries, the complete tank system <br />2. ❑ Run all pumps and verify there are no leaks under dispensers or <br />Site N: <br />City/ST/Zip: <br />3. <br />Date: <br />❑ Impact Valve Test Port <br />the product(s) to be tested must be disabled during <br />❑ Leak Detector Threads <br />the test(s). <br />Scope of Work: <br />4. <br />❑ Secure entire work area with 28" cones, flags, and <br />3. ❑ Install a lead wire seal on all test plugs & leak detectors that <br />caution tape. <br />were serviced. Count LD threads: <br />5. <br />❑ Place fire extinguishers and "No Smoking" signs in <br />L1 -_L2 L3 L4 L5 <br />Parts & Materials Provided: <br />the work area. <br />_ _ _ _ <br />4. ❑ Ensure that all tank system components are restored to their <br />9. <br />Arrival Time at Site: <br />/ , '/ S <br />original state (including): <br />Departure Time from Site: <br />l '— <br />ov l <br />Total Travel Time: <br />ATG probes, sensors, & caps <br />Signature below confirms that the items listed in the POST-TEST Procedures hdJe been visually verified by the location representative. <br />Pre -Test Signature I Post -Test Signature <br />✓ PRE-TEST PROCEDURES <br />✓ POST-TEST PROCEDURES <br />1. <br />❑ Discuss safety procedures with site personnel. <br />1. ❑ Remove all "Lockoul/Tagout" devices. <br />2. <br />❑ Prior to fuel deliveries, the complete tank system <br />2. ❑ Run all pumps and verify there are no leaks under dispensers or <br />must be placed back into working order. <br />in STP sumps. Must be witnessed by site representative. <br />3. <br />❑ All pumps, dispensers, and electrical breakers of <br />❑ Impact Valve Test Port <br />the product(s) to be tested must be disabled during <br />❑ Leak Detector Threads <br />the test(s). <br />❑ Functional Element & Relief Screw <br />4. <br />❑ Secure entire work area with 28" cones, flags, and <br />3. ❑ Install a lead wire seal on all test plugs & leak detectors that <br />caution tape. <br />were serviced. Count LD threads: <br />5. <br />❑ Place fire extinguishers and "No Smoking" signs in <br />L1 -_L2 L3 L4 L5 <br />the work area. <br />_ _ _ _ <br />4. ❑ Ensure that all tank system components are restored to their <br />9. <br />❑ Turn off and secure the circuit breaker(s) of the <br />original state (including): <br />product to be tested with lockout devices and tags. <br />ATG probes, sensors, & caps <br />7. <br />❑ Place "Out of Service" bags on the dispenser nozzles <br />Ball floats, dry breaks & caps <br />of the product(s) to be tested. <br />Cathodic protection system is operational <br />8. <br />❑ Verify proper Lockout/Tagout procedure is complete <br />Containment sumps are dry <br />by trying to operate pumps. <br />Dispensers & POS system <br />9. <br />❑ Close ball valves or check valves on the product <br />Dispenser panels are replaced <br />piping to be tested. <br />Drop tubes, fill adapters & caps <br />10. <br />❑ Remove the electrical "bayonet" connector from <br />- Leak detectors & copper vent tubes <br />1 V <br />the STP(s). <br />- Manhole covers and sump lids <br />Monitoring system is operational <br />I <br />_Shear valves at the dispensers <br />Siphon lines and manifold valves <br />aj✓ <br />- Spill containers & drain valves <br />- STP fittings and bayonet connectors <br />5. ❑ Remove cones, flags, and caution tape. <br />l <br />Tanknology - <br />Pre -Test Signature - <br />Post -Test Signature <br />Signature below confirms that the items listed in the POST-TEST Procedures hdJe been visually verified by the location representative. <br />Pre -Test Signature I Post -Test Signature <br />
The URL can be used to link to this page
Your browser does not support the video tag.