Laserfiche WebLink
Spill Prevention Compliance Corporation <br /> Periodic Integrity Test Certificate <br /> P.O. Box 1289........Waterford, CA 95386 Telephone: (209) 969-0851 <br /> Email: soccorp(ahotmail.com <br /> ClientMaxim Crane Works,LP Contact Person:Mario Bermudez, Ops Mgr <br /> Address 2327 Mariposa Road Secondary Contact:Darrvl Prost, Svc Mer <br /> City/State/Zip Stockton, CA 95213 <br /> Location of Tank(s) if different from Client Address SAME <br /> Tank Information(Brand/gallonage/Fuel Stored/UL or other serial#/miscellaneous) <br /> Unbranded/ 10,000 gallons/Diesel Fuel/No UL serial# (unbranded) <br /> Description of Secondary Containment masonry berm (18'9" x 45' x 4') <br /> Date of Test 10/8/2012 Test Supervisor(s) Todd/Paul McWhorter <br /> METHOD OF PERIODIC INTEGRITY TEST-Primary X Secondary X <br /> 1. Steel Thickness Test(in accordance with API-653 and/or STI P001 (4c edition)- <br /> readings (instrumentationTM-8810 ultrasonic microprocessor: <br /> minimum end/wall thickness .00( 68mm) minimum bottom/wall thickness(.0068mm) <br /> corrosion-circle one (significant or nominal)...pitting-circle one (significant or nominal) <br /> Coating required (explain) No CARB coating req'd/anti-corrosion coatings as needed <br /> Detailed wall thickness readings are held in the SPC Corp client-file (total readings <br /> 2. Nitrogen Blanket_Y_N (document psi readings) Duration <br /> 3. CO2 Blanket YN (document psi readings) Duration <br /> 4. Tracer Gas_Y_N (document inert gas used) Duration <br /> Tracer Gas compatibility factors (describe) <br /> 5. Pressure-Test_YN (document psi readings) Duration <br /> 6. Vacuum Test_YN (document inches of Mercury readings_Duration <br /> 7. Sonar-Test_Y N (document db readings) Duration <br /> 8. Camera(visual) model Lorex MC81845/interstitial X Y N (findings) on file <br /> 9. Hydro-Carbon Sensor(probe)model OMNTEC BOA-PDS Y N findings_ <br /> 10. Hydrology(Water Column)_Y N (document inches of water column <br /> readings) Duration <br /> TEST RESULTS <br /> Is'-Stage: <br /> Pass X Fail (quantify) avg end wall thickness (.0058mm), avg sidewall thickness <br /> 0070mm <br /> 2"d-Stage: <br /> Pass X Fail (quantify)No liquid discharge --photos on file <br /> Comments section maintenance of AST-anti-corrosion coating as needed data on file <br /> Next Scheduled Periodic Integrity Test <br /> If no secondary containment @ time of Test/Annual <br /> Date of Next Scheduled Test <br /> If primary/secondary containment passes test, schedule next periodic integrity test no <br /> later than 3 years from date of initial test October 8, 2015 <br /> Date of Next Scheduled Test (Certificate) <br /> SPC Corp Representative <br />