My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
2300 - Underground Storage Tank Program
>
PR0231136
>
COMPLIANCE INFO 2008 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 1:28:18 PM
Creation date
11/1/2018 3:47:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 2008 - 2012
FileName_PostFix
2008 - 2012
RECORD_ID
PR0231136
PE
2361
FACILITY_ID
FA0003610
FACILITY_NAME
A&A GAS & FOOD MART
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />Page 3 of F <br />Test Method Developed By: X Piping Manufacturer 0 Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: X Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Pressure Gauges in PSI/Nitrogen f Equipment Resolution: 1/10-15 PSI <br />Piping Run #t <br />Piping Run #2 <br />Piping Run #3 <br />Piping Run # <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Smith <br />Piping Diameter: <br />3" <br />3" <br />3' <br />Length of Piping Run: <br />Approx. 185' <br />Approx. 210' <br />Approx. 195' <br />Product Stored: <br />Regular <br />Super <br />Plus <br />Method and location of <br />piping -run isolation: <br />Test boot at STP# 1 <br />Test boot at STP#2 <br />Test boot at STP#3 <br />Wait time between applying <br />pressure and starting test: <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />Test Start Time: <br />9:10 <br />9:20 <br />9:30 <br />Initial Reading (R,): <br />3 PSI <br />5 PSI <br />5 Psi <br />Test End Time: <br />1 10:10 <br />10:20 <br />10:30 <br />Final Reading (RF): <br />5 PSI <br />5 PSI <br />5 Psi <br />Test Duration: <br />I Hour <br />1 Hour <br />1 Hour <br />Change in Reading (RF -R,): <br />0 PSI <br />0 PSI <br />0 Psi <br />J <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss in PSI <br />No Loss in PSI <br />No Loss in Psi <br />Test Result: <br />X Pass ❑ Fail <br />X Pass ❑ Fail <br />X Pass ❑ Fail <br />Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-upfor failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.