My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
2300 - Underground Storage Tank Program
>
PR0231136
>
COMPLIANCE INFO 2008 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 1:28:18 PM
Creation date
11/1/2018 3:47:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 2008 - 2012
FileName_PostFix
2008 - 2012
RECORD_ID
PR0231136
PE
2361
FACILITY_ID
FA0003610
FACILITY_NAME
A&A GAS & FOOD MART
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jan 12"10 01:52p Elite 7V Contactors 12094616342 p.l <br />I/ 2cr <br />UST SYSTEM RETROFIT OR REPAj' __ <br />(Submit minimum of 3 sets of plans & applications as originals will bQ#ned by EHQ) <br />1. Site map enclosed? _ YES [ ] NO [ I <br />l .y! <br />2. Submit copies of ICC Service. Technician and/or Installer's certificate and all man ufacture�4ni v j�'f{�ates for each <br />person installing or testing any component that is repaired or replaced. Ensure a cop�y�f the "Site 11e�lth and Safety <br />Plan" is available on the jobsite as required by Title 8. <br />CD, <br />3. Detailed description of work to be completed. List components to be repaired or replaced`anti:_attsh diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how thtt ll be done. (If <br />adding piping, UDC's, or other UST equipment, or. performing tank top upgrade, use the U� <br />�Installation Application <br />pages 4-8 as necessary for a timely <br />plan -revi`ew�}(:y�,` � �� ,��"��,�:•- a2 _ <br />1Q . <br />I. <br />4. List of -equipment -to be used (Attach manufacturer's specification sheets showing third -party approval): <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.