Laserfiche WebLink
SJCEHD USPS's Stockton Vehicle Maintenance Facili Work Plan <br /> i <br /> Sampling Equipment Decontamination, <br /> All sampling equipment-will be thoroughly cleaned with an aqueous solution of tri-sodium <br /> phosphate and-distilled water or steam cleaned. The cleaning procedure will be repeated <br /> between each sampling location. <br /> Soil Cuttings and Steam Cleaning Rinsate <br /> Soil cuttings and steam cleaning rinsate will -be stored on-site in an EPA approved.drums. <br /> Upon receipt of the.laboratory analytical results,.,the USPS will evaluate disposal options <br /> for.this material. <br /> Report <br /> We will prepare -a.soil evaluation report presenting-the results 'of our investigation and <br /> .summarizing our conclusions and-recommendations.. Our conclusions and <br /> recommendations.will be,based on;readily available information, observations of existing <br /> conditions, and,our interpretation of the analytical data. The report will include a.site plan <br /> showing sampling locations 'and copies of.permits and laboratory data sheets. <br /> SCHEDULE <br /> We are prepared to begin wo&upon receiving approval of.this,work plan. Scheduling <br /> and performance of field work will take approximately two weeks to complete. All <br /> laboratory.analyses will.be performed on a standard one-week laboratory response time. <br /> After receipt of the laboratory,results, review of the data and completion of our report will <br /> take approximately two additional weeks. <br /> If you have any questions, please call-and we will-be glad to discuss them with you. <br /> Very truly yours, <br /> Lowney Associates <br /> Brock A, Foster <br /> "Senior Staff Engineer <br /> BAF <br />€ Copies: Addressee (2) <br /> Attachments: Figure 1 - Site Plan <br /> Figure 2 -AngledExploratory Boring Diagram <br /> Pasadena,864-76 Stockton Work Plan.ddc <br /> LCNV NEVASSOCIATES Page 3 <br /> Envlronrrientdl/Geotechnical/Engineering SeNlces - 864-76 <br />