Laserfiche WebLink
RECEIVED <br /> APR 0 6 2015 <br /> Monitoring System Certification <br /> Monitoring System Certification ENVIRONMENTAL <br /> UST Monitoring Site Plan UCQITU 11CDA0T4ACKIT <br /> Site Address: VALLEY SERVICE STATION 16 E.HARDING WAY STOCKTON CA 95204 <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . O CARBON . . . . . <br /> CANrs'rER <br /> N a . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . STORE <br /> . . . . . . . . . . . . . . . . . . . . <br /> 3 350 <br /> Z A=ANNUALR <br /> C F=FILL . . . . . . <br /> s P=PROBE <br /> a V=VAPOR <br /> S <br /> T=TURBINE <br /> N=SENSOR <br /> 87 <br /> F F <br /> . X \ F 0 <br /> . . . . . . . . . . . . . . . . . . . . . . . . <br /> . ❑ O O F <br /> . . . . . . . . . . . . . . . . . .DIE . F 91. <br /> . . . . . . . . . . . . . . . . . . . . . . . . O O <br /> x <br /> CENTER STREET <br /> Date map was drawn 2014 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 <br />