Laserfiche WebLink
Monitoring System Certification ECEIVED <br /> UST Monitoring Site Plan <br /> Site Address: VALLEY SERVICE STATION 16 E.HARDING WAY STOCKTON CA 95204 NA nY 0 9 2014 <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .HEALTH DEPARTMENT . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . O CARBON <br /> CANISTER <br /> X . . . X . . . . . . . . <br /> . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . <br /> . . . . . . STORE <br /> . . . . . . . . . . . . . . . <br /> Y <br /> . TLS <br /> z A=ANNUALR <br /> C F=FILL <br /> C P=PROBE . . . <br /> V=VAPOR <br /> T=TURBINE <br /> X=SENSOR <br /> . . . . . . . . . . . . . . . . . . . . . . . 87 . . . . . . <br /> F F <br /> . . . . . . . . . . . . . X <br /> 0 . . . . . . . <br /> . . . . . . . . . . . . . . . . <br /> DIE <br /> ❑ 00 F V <br /> . T❑ 91. <br /> . . . . . . . . X 0 0 X . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . 1 ( . . . . . . . <br /> CENTERSTREET <br /> Date map was drawn <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 <br />