Laserfiche WebLink
November 7, 2013 <br />San Joaquin County <br />Environmental Health Department <br />1868 East Hazelton Avenue <br />Stockton, California 95205-6232 <br />Carl Wayne Henderson <br />Service Station Testing, Inc. <br />PO Box 31465 <br />Stockton, CA 95213 <br />Website: www.sjgov.org/ehd <br />Phone: (209) 468-3420 <br />Fax: (209) 464-0138 <br />Re: Valley Arco <br />16 E Harding Way, Stockton <br />DIRECTOR <br />Donna Heran. REHS <br />PROGRAM COORDINATORS <br />Robert McClellon, REHS <br />Jeff Carruesco, RENS, RDI <br />Kasey Foley, REHS <br />Linda Turkatte, REHS <br />Rodney Estrada, REHS <br />Adrienne Ellsaesser, REHS <br />SR0068334 <br />The San Joaquin County Environmental Health Department (EHD) has completed the review of <br />the application for a permit to cold start on the underground storage tank (UST) system at the <br />above noted address. The application is submitted retroactive to the cold start during an <br />emergency repair when the H-8 AfG crash and battery on the panel had to be replaced. The <br />permit has been approved with the following conditions: <br />Contact the local fire department and the San Joaquin Valley Air Pollution Control <br />District for any applicable permits and requirements. <br />2. Any changes in information and scope of work must be submitted to EHD for approval <br />prior to commencing work. All new addenda supersede the previous ones. <br />3. Contact Jeffrey Wong at (209) 468-0335 to arrange the following inspection <br />appointments (a 48-hour notice is required for inspection appointments). Please be <br />aware that inspections for emergency work must be scheduled within five days of permit <br />approval. <br />a. Sensor functionality: Functionality of the monitoring system must be verified to <br />ensure that monitoring has been restored to meet the requirements of Title 23 <br />California Code of Regulations and the Health & Safety Code. Obtain a copy of the <br />alarm history prior to performing the "cold start" of the Veeder Root system and <br />made available at the time of EHD inspection. <br />Please be aware that the facility cannot operate the UST system prior to the EHD <br />inspection and approval. <br />4. Qualified service technicians must possess or work under the direct and personal <br />supervision of an individual physically present at the work site who possesses all of the <br />following: <br />a. One of several permissible valid, current contractor's licenses issued by the <br />Contractors State License Board (may be issued to the installation company), or a <br />Tank Tester's license issued to the individual by the State Water Board, and <br />