Laserfiche WebLink
SWRCB, January 2002 <br />RECgIVFD <br />Secondary Containment Testing Report Form SEP 2 0 2013 <br />This form is intended for use by contractors performing periodic testing of UST secondary containmej44ystems. Use the <br />appropriate pages of this form to report results for all components tested. The completed form, writttest procedures, and <br />printouts from tests (f applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />1. FACILITY INFORMATION <br />Facility Name: Arco Stockton Date of Testing: August 28, 2013 <br />Facility Address: 16 East Harding Way, Stockton, Ca. 95204 <br />Facility Contact: Sukhwinder Kaur Phone: (408) 449-0007 <br />Date Local Agency Was Notified of Testing: 7/24/2013 <br />Name of Local Agency Inspector (if present during testing): <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: R&D Compliance Testing <br />Technician Conducting Test: Benjamin F. Duncan Jr. <br />Credentials: ❑ CSLB Licensed Contractor X SWRCB Licensed Tank Tester <br />License Type: Tank Tester License Number: 90-1120/ICC#5246802-UT <br />Manufacturer Trainin¢ <br />Manufacturer Component(s) Date Training Expires <br />3. SUMMARY OF TEST RESULTS <br />Component <br />lass <br />Fail <br />Not <br />Tested <br />Repairs <br />Made <br />Component <br />Pass <br />Fail <br />Not <br />Tested <br />Repairs <br />Made <br />Annular Tank #1 <br />X <br />❑ <br />❑ <br />❑ <br />Dispenser Sump #9&10 <br />X <br />❑ <br />❑ <br />❑ <br />Annular Tank #2&3 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Secondary Pipe #1 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />1 0 <br />❑ <br />1 0 <br />Secondary Pipe #2 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />I 0 <br />0 <br />0 <br />Secondary Pipe #3 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Piping Sump #1 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Piping Sump #2 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Piping Sump #3 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Dispenser Sump #1&2 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Dispenser Sump #3&4 <br />X <br />❑ <br />❑ <br />❑ <br />0 <br />❑ <br />❑ <br />❑ <br />Dispenser Sump#5&6 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Dispenser Sump #7&8 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />If hydrostatic testing was performed, describe what was done with the water after completion oftests: <br />Test Fluid Supplied and recovered for reuse by, R&D Compliance Testing. <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements <br />Technician's Signature: -Wnj�a Y- grrcremoi-X- Date: August 28, 2013 <br />