My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
2300 - Underground Storage Tank Program
>
PR0231136
>
COMPLIANCE INFO_2013 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 1:43:23 PM
Creation date
11/1/2018 4:00:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2018
RECORD_ID
PR0231136
PE
2361
FACILITY_ID
FA0003610
FACILITY_NAME
A&A GAS & FOOD MART
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />Page __ of -- <br />Fest <br />Test Method Developed By: X Piping Manufacturer Industry Standard Professional En<-ineer <br />Other (Specify) <br />Test Method Used: X Pressure =: Vacuum - Hydrostatic <br />C Other (Specify) <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br />Piping Run #1 Piping Run #2 <br />Equipment Resolution: <br />Piping Run #3 <br />1/10-15 Psi <br />Piping Run # <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Smith <br />Piping Diameter: <br />3" <br />3" <br />3' <br />Length of Piping Run: <br />Approx. 185' <br />Approx. 210' <br />Approx. 195' <br />Product Stored: <br />Regular <br />Super <br />Diesel <br />Method and location of <br />piping -run isolation: <br />Test boot at STP#1 <br />Test boot at STP#2 <br />Test boot at STP#3 <br />Wait time between applying <br />pressure and starting test: <br />10 Minutes <br />10 Minutes <br />10 Minutes <br />Test Start Time: <br />9:15 <br />9:25 <br />9:35 <br />Initial Reading (111): <br />5 Psi <br />5 Psi <br />5 Psi <br />Test End Time: <br />10:15 <br />10:25 <br />10:35 <br />Final Reading (RF): <br />5 Psi <br />5 Psi <br />5 Psi <br />Test Duration: <br />I Hour <br />1 Hour <br />1 Hour <br />Change in Reading (RF-Ri): <br />0 Psi <br />0 Psi <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss in Psi <br />No Loss in Psi <br />No Loss in Psi <br />Test Result: <br />Pass <br />Pass <br />Pass <br />Comments — (include information on repairs made prior to testing, and recommended fol w de'll ) <br />A pt 1 7 �-QV <br />ENVIRONMENTAL HEAITN <br />BrPASTR ENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.