My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
2300 - Underground Storage Tank Program
>
PR0231136
>
COMPLIANCE INFO_2013 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 1:43:23 PM
Creation date
11/1/2018 4:00:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2018
RECORD_ID
PR0231136
PE
2361
FACILITY_ID
FA0003610
FACILITY_NAME
A&A GAS & FOOD MART
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />8. UNDER -DISPENSER CONTAINMENT UDC TESTING <br />Page of <br />Test Method Developed By: UDC Manufacturer Industry Standard X Professional Engineer <br />Other (Specify) <br />Test Method Used: Pressure Vacuum X Hydrostatic <br />L Other (Specify) <br />Test Equipment Used: Caldwell Level Change Indicator <br />Equipment Resolution: .002 <br />M UDC # 9&10 UDC # <br />UDC # l DC # <br />UDC Manufacturer: Containment <br />Solutions <br />UDC Material: <br />Fiberglass <br />UDC Depth: <br />32" <br />Height from UDC Bottom to Top <br />11" <br />of Highest Piping Penetration: <br />Height from UDC Bottom to <br />5" <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />Dry <br />testing: <br />Portion of UDC Tested' <br />Water Line 13" <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />Yes <br />product and water)?* <br />Turbine shutdown response time <br />Not Alarmed <br />Is system programmed for fail- <br />safe shutdown?* <br />Yes <br />Was fail-safe verified to be <br />No <br />operational?* <br />Wait time between applying <br />5 Minutes <br />water and starting test <br />Test Start Time: <br />10:15 <br />Initial Reading (Ri): <br />.001 <br />Test End Time: <br />10:45 <br />Final Reading (RF): <br />.001 <br />Test Duration: <br />30 Minutes <br />Change in Reading (RF-Ri): <br />0 <br />Pass/Fail Threshold or Criteria: <br />.005/30 Minutes <br />Test Result: <br />Pass <br />Was sensor removed for testing? <br />Yes <br />Was sensor properly replaced and <br />verified functional after testing? <br />Yes <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />--.. ,rewiaAC 1Al HEALTH <br />E)F_pApnAFNT <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to a� of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.