Laserfiche WebLink
HAZARDOUS WASTE POINT OF GINERATION <br /> ACCUMULATION REQUIREMENTS <br /> For Use by Unidocs Member'genies or where approved by)nur Local Jurisdiction <br /> Authority Cited:Title 22 CCR§66262.34(e) <br /> The following information summarizes conditions which must be met in order to accumulate hazardous wastes <br /> under point of generation accumulation(i.e., satellite accumulation)requirements. <br /> A. Definition of Point of Generation Accumulation <br /> Point of generation accumulation is the collection of hazardous waste in a container, not a located at or <br /> near the point(i.e., process or piece of equipment) where the waste is generated. The container must be under <br /> the control of the operator of the waste generation process. 2z ccR§66262 34(e)(1)(A) <br /> B. Quantity Limits <br /> No more than 55 gallons of a hazardous waste, or one quart of an acutely hazardous or extremely hazardous <br /> waste,may be accumulated at each point of generation accumulation.location. 'These limits apply to each waste <br /> stream. You can accumulate more than one waste in each point of generation accumulation area. z2 ccR <br /> §6626234(e)(1) <br /> C. Container Requirements <br /> Containers must be: <br /> ® In good condition; 22CCR§66265.171aarefacacedby22CCR§66262.34(exl)(D) <br /> Compatible with the waste held; 22 CCR§66265.172 as referenced by 22 CCR§66262.34(e)(lxD) <br /> Kept closed except when adding or removing waste. 22 CCR§66265.173(a)as reference by 22 CCR§66262.34(c)(1)(D) <br /> D. Labels 22 CCR§66262.34(f)(3)as referenced by 22 CCR§66262.34(e)(1)(b) <br /> The following information must be clearly marked on each point of generation accumulation container: <br /> ® The accumulation start date for the waste(i.e.,the date waste was first placed in the container); <br /> ® The words"HAZARDOUS WASTE'; <br /> The composition of the waste; <br /> The physical state of the waste(i.e., solid or liquid); <br /> (� The hazardous properties of the waste(i.e.,flammable,corrosive,reactive,toxic); <br /> ® The name of the waste generator, <br /> J$J The address of the waste generator, <br /> Within 3 days of reaching the 55 gallon or one quart point of generation accumulation limit,the container <br /> must be marked with the date the quantity limit was reached. <br /> E. Accumulation Time Limits 22 CCR W262.34(ex 1)(B) <br /> You can keep a point of generation accumulation container on-site for a maximum of one year from the date <br /> you first place waste in the container, or 90 or 180 days' from the date you reach the 55 gallon or one quart <br /> point of generation accumulation quantity limit described in Section B, above,whichever occurs first. <br /> Maximum time is 180 days if you add up all hazardous wastes generated at your facility in any month and the total amount is less <br /> than 1,000 kilograms(about 2,200 pounds or 270 gallons);90 days if the total is equal to or greater than that amount <br /> LIN-0S6-117 w,rw.unidom.org R".10109107 <br />