My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ARGONAUT
>
1819
>
2900 - Site Mitigation Program
>
PR0508343
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2018 1:27:56 AM
Creation date
11/1/2018 4:29:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508343
PE
2960
FACILITY_ID
FA0008041
FACILITY_NAME
JOHN TAYLOR - STOCKTON
STREET_NUMBER
1819
Direction
S
STREET_NAME
ARGONAUT
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16320008
CURRENT_STATUS
01
SITE_LOCATION
1819 S ARGONAUT ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTINGRAM NO. R5-2010-0803 S - 6 - <br />JOHN TAYLOR FERTILIZERS CO, INC., WILBUR-ELLIS COMPANY <br />STOCKTON FACILITY, SAN JOAQUIN COUNTY <br />(g) Cumulative data tables for all major constituents of concern containing the <br />water quality analytical results and depth to groundwater for all monitoring <br />wells for the past five years, if applicable. Raw laboratory data shall be <br />provided on CD or DVD and included in the report. The Central Valley Water <br />Board may request additional data as necessary. <br />(h) A copy of the laboratory analytical data report. <br />(i) If applicable, the status of any ongoing remediation, including cumulative <br />information on the mass of pollutant removed from the subsurface, system <br />operating time, the effectiveness of the remediation system, and any field <br />notes pertaining to the operation and maintenance of the system. <br />(j) If applicable, the reasons for and duration of all interruptions in the operation <br />of any remediation system, and actions planned or taken to correct and <br />prevent interruptions. <br />8. An Annual Report shall be submitted to the Central Valley Water Board by 1 <br />November of each year. This report shall contain an evaluation of the effectiveness <br />and progress of the investigation and remediation, and may be substituted for the <br />third quarter semi-annual monitoring report, provided that all information that must <br />be submitted in the fourth quarter or semi-annual report is included along with the <br />following minimum information: <br />(a) Both tabular and graphical summaries of all data obtained during the year. <br />(b) Groundwater contour maps and pollutant concentration maps containing all <br />data obtained during the previous year. <br />(c) A discussion of the long-term trends in the concentrations of the pollutants in <br />the groundwater monitoring wells. <br />(d) An analysis of whether the pollutant plume is being captured by an extraction <br />system or is continuing to spread. <br />(e) A description of all remedial activities conducted during the year, an analysis <br />of their effectiveness in removing the pollutants, and plans to improve <br />remediation system effectiveness. <br />(f) An ide ntification of any data gaps and potential deficiencies/redundancies in <br />the monitoring system or reporting program. <br />(g) If applicable, a proposal and rationale for any revisions to the groundwater <br />sampling plan frequency and/or list of analytes. <br />9. The results of any monitoring done more frequently than required at the locations <br />specified in the MRP also shall be reported to the Central Valley Water Board. <br />
The URL can be used to link to this page
Your browser does not support the video tag.