My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SINCLAIR
>
2110
>
2200 - Hazardous Waste Program
>
PR0540387
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:07:20 AM
Creation date
11/1/2018 5:14:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0540387
PE
2229
FACILITY_ID
FA0023082
FACILITY_NAME
INTERSTATE TRUCK CNTR
STREET_NUMBER
2110
Direction
S
STREET_NAME
SINCLAIR
STREET_TYPE
Ave
City
Stockton
Zip
95215
APN
173-150-130
CURRENT_STATUS
01
SITE_LOCATION
2110 S Sinclair Ave
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\S\SINCLAIR\2110\PR0540387\COMPLIANCE INFO 2016 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
4/11/2018 3:47:19 PM
QuestysRecordID
3006661
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> South Sinclair Avenue (2110) Project No. El5339.000 <br /> Page 2 2 December 2015 <br /> SUMMARY <br /> Based upon our observations, it is our opinion that the construction, to the best of our <br /> knowledge, has been completed in general conformance with the approved project plans <br /> and specifications. <br /> The verb, "to inspect", from which the words "inspection" and "inspector" are derived, as used by <br /> Youngdahl Consulting Group, Inc., means observation and monitoring, and does not mean the <br /> right to control the contractor's work. When authorized by the client, the work will be stopped if <br /> it is perceived that the work is not proceeding according to the plans and specifications. No <br /> guarantee or warranty of the contractor's work is made, expressed, or implied. Conditions and <br /> limitations of the executed contract(Reference 1) shall apply to work performed. <br /> We trust that this letter provides you with the needed information. If you have any questions or <br /> desire additional information, please do not hesitate to call. • <br /> Q(tOFES3/pr. <br /> Very truly yours, `r! <br /> Youngdahl Consulting Group, Inc. Reviewed by: <br /> I�, �( �( <br /> .042560 <br /> 3-31-16 <br /> Dennis S. Eck Martha A. McDonnell, Cryt� p <br /> Staff Geologist Associate Engineer �`�F A11F0 <br /> Attachment: Appendix A <br /> Distribution: 1Copies: Client RECEIVED <br /> n FEB 2 6 2016 <br /> ENVIRONMENTAL <br /> HEALTH^FpARTMrNT <br />
The URL can be used to link to this page
Your browser does not support the video tag.