My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SINCLAIR
>
2222
>
2200 - Hazardous Waste Program
>
PR0528699
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2025 9:40:20 AM
Creation date
11/1/2018 5:14:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0528699
PE
2256
FACILITY_ID
FA0019268
FACILITY_NAME
ECS REFINING LLC
STREET_NUMBER
2222
Direction
S
STREET_NAME
SINCLAIR
STREET_TYPE
Ave
City
Stockton
Zip
95215
APN
173-150-12
CURRENT_STATUS
01
SITE_LOCATION
2222 S Sinclair Ave
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\S\SINCLAIR\2222\PR0528699\COMPLIANCE INFO 2009 - 2016.PDF
QuestysFileName
COMPLIANCE INFO 2009 - 2016
QuestysRecordDate
4/26/2018 9:21:11 PM
QuestysRecordID
3872198
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Attach rinaterminal of Anti -Static Wire to brass screw on <br />Musa Ground Support Plate <br />• Attach alligator clip of Anti -Static Wire to any nearby <br />confirmed ground source, ex. metal pipe. <br />aerosoly MAINTENANCE <br />Per.Wxcleaningandgmasing o/ the cartrdedppedpuncturepn 49 <br />assure yearsd use. ft constant, heavy usage, thepundurepin <br />sloud be cleanedardgreased once a mont. <br />• To clean or replace puncture pin, remove bridge pin at <br />uppermost point of handle. Entire handle mechanism and <br />puncture pin can be removed. <br />Gasket deterioration wigoaur when wsrPong aeromlpak is and <br />aggress4esdvems, regw perioakgaskeI reppcawd. To assure <br />properseat i-moaoTvusage, dieck gaskets rrequengy and <br />replace as required. <br />• To replace gasket, simply pull out old gasket, snap in <br />replacement. <br />COMPLIANCE <br />By bringing the propellant to atmospheric pressure, <br />oerasoNachieves compliance with: <br />40 CFR 261.7(b)(1) <br />40 Cl 261.7(b)(1)(B)(2) <br />40 CFR 261.23(a)(6) <br />Once relieved of pressure, aerosol cans are not regulated <br />waste (OSWER Directive 9432.01 (60)). In addition, <br />puncturing aerosol cans to achieve atmospheric pressure <br />is not considered'treatment°; therefore, permitting is not <br />required. <br />RECYCLING <br />• Recycling 8,000 aerosol cans reduces solid waste and <br />increases recycling by one -ton. <br />• By installing separate aerosor systems on two <br />drums, non -chlorinated aerosols can be collected <br />separately, then reclai <br />minimization credit. <br />• Cans punctured <br />using aerasoTv <br />may be recycled <br />with other scrap <br />steel. <br />urff=17leaves omy <br />a smooth edged hole. <br />med of solvents, resulting in waste <br />
The URL can be used to link to this page
Your browser does not support the video tag.