Laserfiche WebLink
Yes No Comment <br /> 90 Day Accurulation in Tanks (cont.) <br /> (Section 66262.34) <br /> Is the secondary containment system (if required, <br /> see table on page 14) , at a minimum: <br /> [66265.193(c)-] <br /> (1) Constructed of or lined with materials <br /> that are compatible with the waste(s) to be <br /> placed in the tank system, and have sufficient <br /> strength to prevent failure? — <br /> (2) Placed on a foundation or base capable of <br /> providing support to the secondary containment <br /> system and resistance to pressure gradients? — — <br /> (3) Provided with a lead detection system <br /> designed and operated to detect the failure of <br /> either the primary and secondary containment, <br /> or any release within 24 hrs or ASAP? — <br /> (4) Sloped, or designed or operated, or to <br /> remove liquids? — <br /> If there is a release, has material and <br /> accumulated precipitation removed within <br /> 24 hrs or ASAP?, and: [66265.193(c) (4)-] — <br /> (A) If a HW, managed according to all <br /> applicable requirements of Chs. 2 - 15? — <br /> (B) If discharged through point source to US <br /> waters, are sections 301, 304, and 402 of the <br /> Federal Clean water Act (C1,M) complied with? — <br /> (C) If discharged to a POIW, is section <br /> 307 of the CNA complied with? — <br /> (D) If released to the environment, have <br /> reporting requirements of 40 CFR Part 302 <br /> complied with? — <br /> Does secondary containment include one or more <br /> of the following: [66265.193(d)-] <br /> (1) An external liner?, or — — <br /> (2) A vault?, or — <br /> (3) A double-walled tank?, or — <br /> (4) An equivalent device approved by the <br /> Depot? — <br /> Revised 7/15/91 Page 13 <br />