Laserfiche WebLink
Yes No Comment <br /> 90 Day Accumulation in Tanks (cont.) <br /> (Section 66262.34) <br /> If the source of any leak to the environment was <br /> from a cwponent or tank without secondary <br /> containment, arra was below ground or not readily <br /> accessible for visual inspection, was the tank or <br /> entire component provided with secondary <br /> containment (per 66265.193) before returning to <br /> service? [66265.196(f) (4) ] <br /> If the source of any leak to the environment was <br /> from an aboveground visually accessible component, <br /> was it repaired arra certified before returning to <br /> service? [66265.196(f) (4) ] <br /> If the generator has extensively repaired a tank <br /> system that leaked, was the repaired system <br /> certified in accordance with 66270.11(d) before <br /> returning to service? [66265.196(g) ] _ <br /> Tank closure and post-closure care: <br /> At closure, did the generator remove or <br /> decontaminate all waste residues, contaminated <br /> containment system components, structures, soil, <br /> and equipment? [66265.197(a) ] <br /> If the generator demonstrated that all <br /> contaminated soils cannot be removed or <br /> decontaminated, did they close the tank and <br /> perform post-closure care as a landfill <br /> (per 66265.310) and meet all the requirements <br /> for landfills as specified in Arts. 7 and 8 of <br /> Ch. 15? [66265.197(b) ] <br /> The Manifest <br /> (Chapter 12, Article 2) <br /> Does the generator: [66262.20-] <br /> (a) Prepare a complete manifest according to <br /> the instructions (see Ch. 12 Appendix) before <br /> transporting HW off-site? _ <br /> (b) Designate on the manifest a facility which <br /> is permitted to handle the HW? <br /> (d) Designate another facility or instruct <br /> transporter to return waste if delivery to <br /> designated facility is prevented? <br /> Revised 7/15/91 Page 17 <br />