Laserfiche WebLink
Yes No Comment <br /> Preparedness and Prevention (cont. ) <br /> Chapter 15, Article 3 <br /> If personnel handle HW alone, do they have <br /> immediate access to a device capable of sunmioning <br /> outside assistance? [66265.34(b) ] — <br /> Is there adequate aisle space for unobstructed <br /> movement of personnel and emergency equipment? <br /> [66265.35] — <br /> Has the generator attempted to make the following <br /> arrangements, as appropriate: [66265.37(a)-] <br /> (1) To familiarize police, fire depts. and other <br /> emergency responders with HW operations and <br /> facility layout? — <br /> (2) If more than one responder, designating <br /> primary authority? — <br /> (3) Agreements with emergency response teams, <br /> contractors and suppliers? — <br /> (4) To familiarize local hospitals with <br /> properties of wastes handled and potential <br /> injuries or illnesses? — — <br /> Has the generator documented any refusal to enter <br /> into such arrangement? [66265.37(b) ] — <br /> Contimency Plan and Emercrency Procedures <br /> Chapter 15, Article 4 <br /> Does the generator have a contingency plan <br /> designed to minimize hazards from HW <br /> incidents? [66265.51(a) ] yLdc�it� <br /> Have the provisions of the plan been carried out /f <br /> immediately when there is a HW incident which <br /> could threaten human health or the environment? I ' A <br /> [66265.51(b) ] IV0�1�Pel J 11-a t &-A-.e-, . <br /> Does the plan describe actions personnel must take <br /> to respond to emergencies? [66265.52(a) ] — <br /> Does the plan describe the arrangements agreed to <br /> in 66265.37? [66265.52(c) ] — <br /> Does the plan list names, addresses and phone <br /> numbers (office and home) of all qualified ECs, <br /> and name one as primary EC with the others listed <br /> in order of responsibility? [66265.52(d) ] — <br /> Revised 7/15/91 Page 22 <br />