Laserfiche WebLink
Yes No Comment <br /> Contingency Plan and Emergency Procedures - Continued <br /> Has the plan been reviewed and immediately <br /> amended whenever: [67143-/265. 54-] <br /> (b/a) Applicable regulations are <br /> revised? — — <br /> (c/b) The plan fails in an emergency? — — <br /> (d/c) Facility changes require it? — — <br /> (e/d) The list of emergency <br /> coordinators changes? — — <br /> (f/e) The list of emergency equipment <br /> changes? — — <br /> Is there at all times at least one <br /> employee at the facility, or close by and <br /> on call, designated as EC, who is <br /> thoroughly familiar with all facility <br /> operations, wastes, records, layout, <br /> and emergency procedures, who has <br /> authority to commit the resources to <br /> carry out the contingency plan? <br /> (67144/265. 55) — <br /> If an emergency has occurred at this <br /> facility, did the EC comply with all <br /> required emergency procedures? <br /> (67145/265.56] — <br /> Page 14 <br />