Laserfiche WebLink
Page 2 • EXHIBIT V • <br /> 7. RECORD DATE/TIME THAT DIVISION MANAGEMENT WAS NOTIFIED: <br /> A. V. P. OPERATIONS / <br /> B. HEAD MAINT. ENGINEER OR <br /> S.S.S. COORDINATOR / <br /> 8. IS EPA AND/OR FDA NOTIFICATION NECESSARY? <br /> A. DATE/TIME EPA NOTIFIED:_ / <br /> B. DATE/TIME FDA NOTIFIED: / <br /> 9. IF TRANSFORMER, HAVE REPAIRS COMMENCED WITHIN TWO BUSINESS DAYS OF <br /> THE DATE LEAK WAS DISCOVERED? <br /> 10. HAS PCB INVENTORY BEEN ADJUSTED? <br /> JTT/lm <br /> Issued 4-27-82 <br />