Laserfiche WebLink
Yes No Comment <br /> Scoping of Checklist <br /> Does the generator qualify as a RCRA conditionally <br /> exempt small quantity generator by: / <br /> Generating less than 100 kg/mo, and accumulating <br /> less than 1000 kg of RCRA HW on site? <br /> [40 CFR 261.5(a) , (g) ] or: <br /> Generating and accumulating less than 1 kg. of <br /> RCRA acute HW, or 100 kg of RCRA acute HW <br /> contaminated soil or spill residues? <br /> [40 CFR 261.5(e) (1-2) ] _ <br /> Does the generator generate between 100 and <br /> 1000 kg of RCRA non-acute* HW per month, and never <br /> accumulate more than 1000 kg of HW on site? <br /> * Generators of more than 1 kg/mo, or who accumulate more than 1 kg at any time, of RCRA <br /> acute HW (listed in 40 CFR 261.33(e) ) are fully regulated RCRA generators. (Reference 40 <br /> CFR 261.5(f) (2)) <br /> Does the generator accumulate HW in containers? <br /> If no, omit page 6. / <br /> Does the generator accumulate HW in tanks? ✓ <br /> If no, omit pages 8 through 16. <br /> Has the generator exported HW in the last 3 years?_ <br /> If no, omit pages 31 through 35. <br /> Has the generator imported HW in the last 3 years?_ <br /> If no, omit page 36. <br /> Is the generator a farmer generating waste <br /> pesticide(s)? <br /> If no, omit page 37. <br /> Does the generator handle containers, or inner <br /> liners removed from containers, which previously <br /> held a hazardous material? _ <br /> If no, <br /> I cndt page 38. <br /> -Fry le P � �� { OU569 0g <br /> NOTE: This page is designed to help you identify non-applicable sections of the checklist, <br /> and to gather information. A "No" answer on this page does not indicate a violation. <br /> Revised 7/15/91 Page 2 <br />