Laserfiche WebLink
Yes No Comment <br /> 90 Day Accunilation (cont.) <br /> (Section 66262.34) <br /> If the generator has stored HW on-sitefor more, <br /> than 90 days*, have they: [66262.34(c) ] <br /> - Been granted an extension? or: <br /> - Complied with requirements for owners/operators <br /> in Chs. 14 and 15, and the permitting <br /> requirements in Ch. 20? <br /> * Except at the point of initial generation in ccupliance with 25123.3(d)/66262.34(e) . <br /> (see "Generation Points", Page 4) <br /> 90 bay AccLmulation in Containers <br /> (Section 66262.34) <br /> While accumulating waste in containers for 90 days <br /> or less without a permit or interim status, has <br /> the generator coffplied with: [66262.34(a)-] <br /> (1) Art. 9 of Ch. 15, and sections 66265.111 and <br /> 66265.114? (See pages 6 to 7) _ <br /> (2) 66262.34(f)? (See next page) _ <br /> (3) Requirements for owners/operators in Arts. 3 <br /> and 4 of Ch. 15 and section 66265.16? <br /> (See pages 20 to 24) <br /> If closed, was the facility closed in a manner <br /> that: [66265.111-] <br /> (a) Minimizes further maintenance? and <br /> (b) Minimizes escape of HW, constituents, <br /> leachate, contaminated rainfall or run-off, or <br /> decxnposition products? I <br /> _ <br /> If closed were contaminated equipment, structures <br /> and soils properly disposed of or decontaminated? <br /> [66265.114] <br /> Revised 7/15/91 Page 5 <br />