Laserfiche WebLink
DAILY AND WEEKLY INSPECTIONS OF WASTE DRUMS <br /> Effective immediately the waste oil drum will be inspected daily and the 55 <br /> gallon drums will be inspected weekly an inspection form will be dated and <br /> initialed by the person doing the inspection. There will be one form for each <br /> month. A new form will be exchanged on the first of every month. There will <br /> be a clip board in place located near the waste oil drum. The inspection(s) <br /> will include: <br /> ➢ Ensure the cap/bung is in place. <br /> ➢ Inspect for leaks, cracks or other damage. <br /> ➢ Check containment (waste oil drum only) for any oil, if there is any oil in <br /> the containment it must be cleaned immediately. <br /> ➢ Check for capacity, to assure space for the waste to be added. <br /> ➢ Check proper labeling, accumulation date. <br /> It is imperative that if any deficiencies are found in the inspection corrective <br /> action is taken immediately and that your supervisor is notified. <br />