My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
14749
>
2200 - Hazardous Waste Program
>
PR0519127
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 11:12:07 AM
Creation date
11/1/2018 5:44:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0519127
PE
2228
FACILITY_ID
FA0000482
FACILITY_NAME
3 b's truck & auto plaza
STREET_NUMBER
14749
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
000-027-346-4
CURRENT_STATUS
01
SITE_LOCATION
14749 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\THORNTON\14749\PR0519127\COMPLIANCE INFO 1992 - 2016.PDF
QuestysFileName
COMPLIANCE INFO 1992 - 2016
QuestysRecordDate
3/19/2018 5:24:41 PM
QuestysRecordID
3830196
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TIP - 1 <br />Appendix 1 <br />Assessment Requirements for <br />Tiered Permitting System. Tanks <br />You have determined that the tank/system you are concerned with is subject to <br />regulation as a Tiered Permitting System Tank. <br />Assessment Standards: <br />First Assessment: The first assessment of the tank/system integrity needs to <br />occur prior to placing the tank/system into operation or by January 24, 1998 <br />(whichever is later). <br />Assessment effective term: Assessments are valid for one year for tanks installed <br />or operating prior to 1991. Assessments for tanks installed or operating after <br />1991 are valid for five years. <br />Assessment renewal: Every five years. if containment is not in place, or found <br />not to meet standards, the assessment must be renewed annually <br />Assessment Contents: <br />(1) Certification from an independent professional engineer. <br />(2) An assessment of a Tiered Permitting System Tank must include the following <br />information: <br />Material of construction <br />Material thickness and how the thickness was determined <br />Description of the system piping (materials, diameters) <br />Description of any internal and external pumps <br />A sketch or drawing of the tank, including the dimensions <br />Age of the tank <br />Description and evaluation of leak detection equipment <br />Description and evaluation of corrosion protection equipment <br />Description and evaluation of spill control or overfill equipment <br />Characteristics of the wastes handled <br />Description of any structural damage or inadequate installation or <br />construction <br />Results of leak test, internal inspection or other integrity testing (noting <br />type of test performed) <br />Estimate of service life of the tank <br />Description and evaluation of secondary containment, including ancillary <br />equipment <br />Regulatory Reference: <br />California Code of Regulations, title 22, section 66265.191, subd. (e)(1) <br />California Code of Regulations, title 22, section 66262.192, subd. (h)(1) <br />This tank/system is eligible for a one-time three-year exemption from assessments if <br />granted by a CUPA. <br />
The URL can be used to link to this page
Your browser does not support the video tag.