My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
14749
>
2200 - Hazardous Waste Program
>
PR0519127
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 11:12:07 AM
Creation date
11/1/2018 5:44:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0519127
PE
2228
FACILITY_ID
FA0000482
FACILITY_NAME
3 b's truck & auto plaza
STREET_NUMBER
14749
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
000-027-346-4
CURRENT_STATUS
01
SITE_LOCATION
14749 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\THORNTON\14749\PR0519127\COMPLIANCE INFO 1992 - 2016.PDF
QuestysFileName
COMPLIANCE INFO 1992 - 2016
QuestysRecordDate
3/19/2018 5:24:41 PM
QuestysRecordID
3830196
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE HEALTH AND SAFETY PLAN <br />PART I <br />GENERAL SITE. INFORMATION <br />1. Site Name: 3B's truck & auto plaza <br />Address: 14749 N. Thornton Rd. Lodi, CA 95242 <br />Contact Person: Tony Ifhatarine No: 209 368-8100 <br />Sweeps Number: <br />Proposed Date of investigation/inspection: 3-14-11 <br />2. <br />3. <br />Description and brief narrative of inspection activity: <br />❑ New UST installation. <br />❑ UAR Investigation. <br />❑ Tank Closure in Place. <br />❑ Tank/Pipe Repair. <br />❑ Tank/Pipe Removal. <br />❑ Re -excavation. <br />❑ Installation of Borings / Monitoring Wells. <br />® HW inspection <br />Specific Site Information: <br />Tank No.: <br />Tank Capacity: <br />Tank Content: <br />Tank Age: <br />Other: <br />4. Type of Operation: truck stop <br />5. Release History: <br />Evidence of leaks / soil contamination: ❑ YES ❑ NO <br />Documented Groundwater contamination: ❑ YES ❑ NO <br />Background and description ofany previous investigation or incidence: <br />6. Potential Health and Safety <br />Physical Concerns: (check all that apply & describe) <br />❑ Heat or Cold Stress: °F (high ambient temp.) <br />❑ Noise Sources: traffic. <br />❑ Oxygen Deficiency: <br />❑ Excavation: (falls, trips, slipping, cave-ins): <br />❑ Handling and Transfer of a Hazardous Substance: (fire, explosions, <br />etc..): <br />❑ Confined space entry: (explosions): <br />Heavy equipment (physical injury & trauma resulting from moving <br />equipment): bie ries <br />❑ Other, specify <br />7 <br />Anticipated Biological Hazards: <br />❑ Snakes Z Insects ❑ Rodents <br />❑ Other/Unknown (spccify): <br />❑ Poisonous Plants <br />8. Narrative (provide all information which could impact Health and Safety, <br />e.g., power lines, integrity of dikes, terrain, etc.) <br />EH 23081 (12/17/2002) <br />PART II <br />EVALUATION OF POTENTIAL HAZARDS <br />1. Chemicals Hazards <br />Z Carcinogens: oil, fuel <br />® Corrosives: battery acid <br />❑ Dusts: <br />❑ Explosives: <br />ZFlammables: oil. fuel <br />❑ inorganic Gases: <br />❑ Metals: <br />❑ Oxidizers: <br />❑ PCB's: <br />❑ Other: <br />PART III <br />REQUIRED PERSONAL PROTECTIVE EQUIPMENT <br />I . Monitoring Equipment (note: Monitoring instruments must be used for all <br />operations unless appropriate rationale or restrictions are provided) <br />❑ Combustible Gas/Oxygen Meter. <br />❑ Detector Tubes (Specify). <br />❑ Photo ionization Detector. <br />❑ Organic Vapor Analyzer. <br />❑ Other, specify. <br />If monitoring instruments are not used, rationale or activity / area restrictions: <br />2. Personal Protective Equipment <br />Level of Protection. ❑ A ❑ B ❑ C ® D <br />® Hard Hat. <br />® Safety Glasses/goggles. <br />❑ Steel toed shank shoes or boots. <br />❑ Flame retardant coveralls. <br />® Hearing protection. <br />❑ Tyvek. <br />❑ Respirator: ❑ APR ❑ SCBA <br />A/P cartridge: <br />❑ Safety vest. <br />❑ Two-way communication <br />PART IV - PLAN APPROVAL <br />Plan Prepared by: Aris Cacapit Date: March 14, 2011 <br />Plan Approved by: U Date: ' t <br />
The URL can be used to link to this page
Your browser does not support the video tag.