Laserfiche WebLink
3AZARDOUS MATERIALS MANAf ENT PLAN • Page 2 of _ <br />3 5:OOP.M.-12:OOA.M. 0 <br />METHOD OF EMPLOYEE NOTIFICATION (8) <br />(e.g. siren, public address system, verbal SIREN, VERBAL ORDERS <br />orders, etc.) <br />EVACUATION ASSEMBLY AREA(S)(9) VALLEJO COURT <br />(Where employees are to report to) <br />LOCATION OF HMMP FOR EMPLOYEE USEINKITCHEN OF OFFICE & OUTSIDE OF OFFICE DOOR IN <br />(10) SHOP <br />SURROUNDING OCCUPANCIES AND LAND USE SECTION (11) <br />The following types of neighbors (e.g. residential, commercial, open space) are located within 1/8th mile of our facility. <br />Names of hospitals, schools, and day-care centers within 1/8th mile of our facility are also shown. This information <br />should be provided to the 9-1-1 operator at the time of the initial notification. <br />NORTH N/A EAST CARRIER <br />SOUTH LA HABBRA WEST HERTZ EQUIP. <br />SPILL CONTROL PROCEDURES SECTION <br />The following types of neighbors (e.g. residential, commercial, open space) are located within 1/8th <br />mile of our facility. Names of hospitals, schools, and day-care centers within 1/8th mile of our facility <br />are also shown. This information should be provided to the 9-1-1 operator at the time of the initial <br />notification. <br />SPILL CONTROL LEADER (12) SERGIO GONZALES <br />(also oversees inspections of areas or <br />systems vulnerable to earthquakes) <br />HE FOLLOWING INDIVIDUALS/POSITIONS ARE ASSIGNED TO HELP CONTROL A SPILL (13) <br />ERGIO GONZALEZ, DAREN DEDALT <br />AUTHORIZED SPILL CONTROL STRATEGIES (14) <br />This business has authorized the above personnel to perform the action(s) indicated below to control spills of <br />hazardous materials on its property. Persons performing these tasks will possess written procedures for performing <br />hem and will have received training on the procedures and equipment needed prior to carrying them out. Locations of <br />needed equipment are shown on the facility map. At a minimum our business must isolate the area of the spill and <br />make notifications. <br />PILLS OF LIQUID MATERIALS <br />F Plug and Patch Container r Build Retention Dike <br />F Remove Sources of Ignition F Position Container so as to Stop Leak <br />r Reduce Pressure in Container/System F Isolate Area and Make Notifications <br />F Neutralize Spilled Material F Secure System Valves and Closures <br />F Shutdown System Involved F Apply Absorbent Material to Spill Area <br />F_ N/A <br />RELEASE OF COMPRESSED GASES SPILLS OF SOLID MATERIALS <br />Tv Shut Off Valves/Systems F Cover Spill to Prevent Spread <br />F_ Ventilate Area of Release F Neutralize Spilled Materials <br />ittp:Hsjoesdata.org/gp_hmmp_detail.lasso?-Database=transaction+Plan+File&-Table=cdml hmmp&Bus+I... 4/18/200' <br />