My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1985 - 2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VIA NICOLO
>
17950
>
2200 - Hazardous Waste Program
>
PR0527247
>
COMPLIANCE INFO 1985 - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 11:11:56 AM
Creation date
11/2/2018 8:29:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985 - 2016
RECORD_ID
PR0527247
PE
2220
FACILITY_ID
FA0002971
FACILITY_NAME
MUSCO FAMILY OLIVE CO
STREET_NUMBER
17950
Direction
W
STREET_NAME
VIA NICOLO
City
TRACY
Zip
95377
APN
20911032
CURRENT_STATUS
01
SITE_LOCATION
17950 W VIA NICOLO
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\V\VIA NICOLO\17950\PR0527247\COMPLIANCE INFO 1985 - 2016 .PDF
QuestysFileName
COMPLIANCE INFO 1985 - 2016
QuestysRecordDate
9/14/2017 5:08:14 PM
QuestysRecordID
3636231
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 Memorandum * <br /> CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD e CENTRAL VALLEY REGION <br /> 3201 S Street Sacramento, California 95816 Phone: 445-0270 <br /> TO: Antonia Vorster4V FROM: Dave Brent <br /> Senior Engineer Area Engineer <br /> DATE: 14 November 1986 SIGNATURE: . <br /> SUBJECT: MUSCO OLIVE PRODUCTS, TRACY <br /> I have completed my review of the Quality Assurance and Control Report for the <br /> subject site. My review process included reading the 0/0 report, the specifica- <br /> tions, the waste discharge requirements and applicable sections of Subchapter 15 <br /> to get an overall view of the requirements and how construction of the pond was <br /> to be implemented. I then read the QA/QC report to get an understanding of the <br /> testing, construction and inspection methods used. Next I used a checklist and <br /> did an item by item review. I completed my review by again reading the QA/QC <br /> report and then breaking down the items that were lacking into two categories: <br /> major and minor items of concern (attached) . <br /> I found that all testing and construction methods given in the D/O report and <br /> the specifications were not followed to the letter during actual construction. <br /> When this occurred, I investigated to make sure that the end result was the <br /> desired one and that the method used to obtain that result was acceptable and <br /> justified in the report. <br /> The remaining items of concern, as stated above, were categorized into major <br /> and minor items and summarized in the attached table. The major items are <br /> what I considered to be those items that would delay pond operation because of <br /> lack of structural integrity, questionable engineering judgement, or a ir- <br /> reversible loss of reliable background information. The minor items are those <br /> that are important and required by the Board's Order but, can be addressed while <br /> the impoundment is in operation. <br /> The major items were forwarded to Larry Test via phone conversations of 21 and <br /> 24 October. I told him these issues would hold up use of the pond. He <br /> completed an addendum to the QA/QC report addressing these areas of concern <br /> which I received on 28 October. The addendum responds satisfactorally to the <br /> major concerns, thus leaving only the minor issues to be dealt with. <br /> The minor items that require additional work are the long-term pond capacity <br /> and cleanout procedures. The pond balance was based on the evaporation rate of <br /> fresh water. The saline water contained in the impoundment will have an <br /> evaporation rate less than fresh water therefore pond capacity may be reached <br /> much sooner than predicted in the QA/QC report. Pond cleanout procedures such <br /> as drying, loading, hauling and inspection are mentioned in the report, but <br />
The URL can be used to link to this page
Your browser does not support the video tag.