Laserfiche WebLink
STATUS REPORT <br /> MUSCO OLIVE PRODUCTS, INC. <br /> Major Items Status <br /> 1. No clear documentation of the perched ground water Covered in the QA/QC <br /> zone monitoring is included in the QA/QC report. addendum of 28 Oct. <br /> It is required to sample the monitoring well two 1986. <br /> times, at least 30 days apart, before discharging <br /> to the impoundment. (WDRs A.6.d. ) <br /> 2. The manufacturer of the synthetic liner is to Covered in the QA/QC <br /> perform an array of test "in-house' on the liner addendum of 28 Oct. <br /> and certify its quality. (Pg. 7 of specifica- 1986. <br /> tions, sec. 4.1, 4.3, 4.4) <br /> 3. The Leachate Collection and Removal System is to Covered in the QA/QC <br /> have a water sample taken from the water recovered addendum of 28 Oct. <br /> during the testing of the system. (Design and 1986. <br /> Operations Report Addendum, Pg. 3) <br /> Minor Items Status <br /> 1. A pond balance calculation should be done based Inadequate <br /> on increasing salinity of the water. The balance <br /> presented in the QA/QC report is based on evapora- <br /> tion rates of fresh water. (WDRs C.1.b) <br /> 2. The pond cleanout methods should be presented in Inadequate <br /> a detailed fashion. (WdRs C.1.c) <br /> 3. The maximum pond elevation should be the 2 feet Covered in the QA/QC <br /> of freeboard required minus the amount of the addendum of 28 Oct. <br /> 1,000 year storm. It's currently given as 2 feet. 1986. <br /> (WDRs C.1.d) <br /> DLB:jj <br />