Laserfiche WebLink
ELIC <br /> ENGINEERING <br /> CORPORATION <br /> 287 N. Cardinal Avenue • P. O. Box 2076 • Stockton, California 95201 <br /> lank Decontamination Procures <br /> lelic Engineering Corporation will remove all residue in tank <br /> by high pressure wash and steam. 1he tank will be steamed at <br /> 200° - 300° degrees for approximately 45 minutes and then high <br /> pressured washed . All residue will be removed from tank by <br /> means of a vac truck and transported • to a State certified lSDF <br /> on a hazardous waste manifest . the above tank decontamination <br /> will be performed by lelic Engineering Corporation and rinsate <br /> will be transported by a Licensed Hazardous Waste Hauler .??Once <br /> tank is empty of all residue , the tank will be purged by means <br /> of inserting 20 pounds of Dry Ice per 1 , 000 gallons compacity <br /> of tank . <br />