My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1989
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
U
>
UNION
>
500
>
2300 - Underground Storage Tank Program
>
PR0541419
>
REMOVAL_1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2024 2:53:15 PM
Creation date
11/2/2018 3:10:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1989
RECORD_ID
PR0541419
PE
2361
FACILITY_ID
FA0023735
FACILITY_NAME
WALLID M BITAR
STREET_NUMBER
500
Direction
N
STREET_NAME
UNION
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
21703019
CURRENT_STATUS
02
SITE_LOCATION
500 N UNION RD
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\U\UNION\500\PR0541419\REMOVAL 1989 .PDF
QuestysFileName
REMOVAL 1989
QuestysRecordDate
10/20/2017 7:46:34 PM
QuestysRecordID
3693295
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TELIC ENGINEERING CORPORATION (TEC) STANDARD OPERATING <br /> PROCEDURE (SOP) N 88-005 <br /> GENERAL GUIDELINES FOR UNDERGROUND TANK REMOVAL <br /> 1. UNDERGROUND STORAGE TANK REMOVALS <br /> The following procedures should be used prior to the removal <br /> of any underground tank that previously stored a flammable <br /> or combustible liquid. In addition, the procedures outlined <br /> below must be followed to ensure that the entire preparation <br /> and removal operation is conducted in a sate manner and the <br /> possibility of an explosive incident is minimized. <br /> A. Plan Review/ chedul of Removal <br /> The following sequence is required to ensure prompt <br /> and successful removal inspections: <br /> ' Upon receipt of the aQproved plans from <br /> Environmental Health, forward one set to <br /> Local Fire Department, and one set to the <br /> local building department. <br /> ` At least 2 working days prior to the removal <br /> of underground storage tank(s), contact the <br /> local Fire Prevention Field Department and <br /> Health Department. <br /> B. Removal/On-Site Frocedures <br /> Telic Engineering Corporation shall ensure that �l <br /> flammable liquids/materials have been removed <br /> from the tank(s) by means of an approved vacuum <br /> truck prior to excavation. <br /> Under no circumstances shall welding equipment, <br /> torches or any device capable of acting as an <br /> - 18 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.