My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
U
>
UNION
>
640
>
2300 - Underground Storage Tank Program
>
PR0231267
>
BILLING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2024 10:13:06 AM
Creation date
11/2/2018 3:10:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
RECORD_ID
PR0231267
PE
2381
FACILITY_ID
FA0005716
FACILITY_NAME
FOREMOST DAIRY
STREET_NUMBER
640
Direction
N
STREET_NAME
UNION
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
640 N UNION ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\U\UNION\640\PR0231267\BILLING .PDF
QuestysFileName
BILLING
QuestysRecordDate
10/20/2017 9:45:59 PM
QuestysRecordID
3693767
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�eooaces co <br /> STATE OF CALIFORNIA <br /> STATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B <br /> COMPLETE A SEPARATE FORM FOR EAC NK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ON SITE <br /> ONE ITEM L] 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ e TANK REMOVED ,S <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS— SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK LD.x O B. MANUFACNRED BY: <br /> C. DATE INSTALLED(MO/DAVlYEAR) �� D. TANK CAPACITY IN GALLONS: Q(� U <br /> ILTANKCO S IF A-1 IS MARKED,COMPLETE ITEM C. <br /> 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. / C. ❑ 1flUN EAD D REGULAR ❑ 3 DIESEL ❑ 6 AVIATION GAS <br /> A. IL�J/ 4 GASAHOL <br /> BD EMPTY 1 PRODUC <br /> ❑ 2 PETROLEUM ❑ T ❑ 1bP LEAD D ❑ 5 JET FUEL ❑ 7 METHANOL <br /> ❑ 3 CHEMICALPRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE 2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED. ENTER NAME OF SUBSTANCE STORED C.A.S.x <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.S.AND C,AND ALL THAT APPLIES IN BOX D AND <br /> A. TYPE OF ❑ YCOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM - 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> B. TANK [:] 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEELCLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 6 100% METHANOL COMPATIBLE W/FRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> F—] 1 RUBBER LINED ❑ 2 D LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR [715 GLASS LINING ,3^('/6 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> LINING <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES— NO— <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 ATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION 91 NONE ❑95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE AIFABOVEGROUNDORUIFUNDERGROUND,BOTH IFAPPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U B 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ MONBORING ❑ 99 OTHER <br /> V.TANK LEAK DETECTION <br /> F9[7 UAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 ZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> TESTING ❑ 7 INTERSTITIAL MONITORING Eft 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES NO <br /> SUBSTANCE REMAINING GALLONS INERTMATERIAL7 ❑ <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED a SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK-A-NK# <br /> STATE I.D.# FM a (� L J I I <br /> PERMITNUMBER PERMIT APPROVED BY/DATE PERMITEXPIRATIONDATE I Iyly v <br /> FORM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br />
The URL can be used to link to this page
Your browser does not support the video tag.