My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1989
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
U
>
UNION
>
721
>
2300 - Underground Storage Tank Program
>
PR0232416
>
REMOVAL_1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2024 10:15:29 AM
Creation date
11/2/2018 3:11:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1989
RECORD_ID
PR0232416
PE
2381
FACILITY_ID
FA0003858
FACILITY_NAME
CRAIG & HAMILTON
STREET_NUMBER
721
Direction
N
STREET_NAME
UNION
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
721 N UNION ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\U\UNION\721\PR0232416\REMOVAL 1989 .PDF
QuestysFileName
REMOVAL 1989
QuestysRecordDate
8/18/2017 7:55:37 PM
QuestysRecordID
3593596
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQLJI N LOCAL HEALTH D I S TR I CT <br /> SAMPLING PROTOCAL FOR ROUTINE TANK REMOVALS <br /> The following represents minimum sampling criterion required for closure compliance. Soil <br /> samples collected shall be representative of native soils beneath the tank's <br /> Invert [tank's bottom] at a collection depth not be exceed 2 - 9 feet. If contamination <br /> is documented during closure an Unauthorized Release notification must be filled out and <br /> submitted to SJLHD within 5 days. Section 2652, CCR. <br /> WATER NOT PRESENT IN THE TANK PIT <br /> TANK SIZE MINIMUM NUMBER OF LOCATION OF SOIL SAMPLES <br /> SOIL SAMPLES <br /> Less than 1000 gallons ONE per tank Fill or pump end of tank <br /> 1000 - 10,000 gallons TWO per tank One at each end of tank <br /> 10,001 gallons and up THREE OR MORE gEnds and Middle or <br /> Per tank the erally lengthspaced along <br /> of ng <br /> Piping ONE EVERY 20 LINEAL FEET <br /> WATER IS PRESENT IN TANK PIT <br /> TANK SIZE MINIMUM NO. OF LOCATION OF SOIL MINIMUM NUMBER <br /> SOIL SAMPLES SAMPLES OF WATER SAMPLES <br /> 10,000 GALLONS From wall next to <br /> OR LESS tank ends at soil/ <br /> (Single Tank) TWOgroundwater ONE <br /> interface <br /> GREATER THAN From wall next to ONE <br /> 10,000 GALLONS tank ends at soil/ <br /> ORgroundwater <br /> TANK CLUSTER FOUR interface <br /> OTHER SPEC I AL CONE)I T I ONS <br /> SLAB PRESENT IN TANK PIT <br /> Soil samples shall be obtained beneath the slab within native soils. Penetration through <br /> the obstruction will be required in order to collect the samples. (Physical removal of the <br /> obstruction will then allow sampling according to the above conditions. ) <br /> TANK SIZE MINIMUM NUMBER OF LOCATION OF SOIL SAMPLES <br /> SOIL SAMPLES <br /> Less than 1000 gallons THREE per tank Center and ends or sides <br /> 1000 - 10,000 gallons FIVE per tank Center and ends or sides <br /> 10,001 gallons and up FIVE OR MORE per Ends and Middle and <br /> tankgenerally spaced along <br /> the length of the tank <br /> EH 23 097 12/88 <br /> REVISED 1/89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.