Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STGE TANK• <br /> MONITORING PLAN-(Pae 1 of 2) NCIENE® <br /> TYPE OF ACTION [11.NEW PLAN ❑ 2.CHANGE OF INFORMATION 2009 0141 <br /> PLAN TYPE 0 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. FEB 1 490.2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S) <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) l <br /> BUSINESS NAME(Same as FACILITY NAME) M,L S Lt r C 3. <br /> BUSINESS SITE ADDRESS 40b &rO-"I,s 1QAA,g cl J IOJ_ CITY /l� IN, <br /> II.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR '2632,2634,2638 2641 <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): 4�3 <br /> 4903bb <br /> III.MONITORING LOCATIONS <br /> ❑1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)4904 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> Nf 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 4905 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> _ SECONDARY CONTAINMENT IS: ❑ a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM ac's <br /> _.____-_PANEL MANUFACTURE] 490-7 CO �N�--___-______a9oa MODEL_#: 490-8 <br /> -_ _____--__-_____ <br /> LEAK SENSOR MANUFACTURER: °90'� MODEL#(S): <br /> -17-2-AU I OMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK($).(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: 49042. 490-13 <br /> -------PA _- MODEL#: <br /> ___IN-TANK PROBE MANUFACTURER_ _ _ __ __ 490-14. 49015 MODEL#(S): _ <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16 <br /> _ ____ ❑ d.MONTHLY _ __ El e.OTHER(Specify): 49017 <br /> PROGRAMMED TESTS_ [I a.0.1 g.p_ [Ih. b 0.2 g_.h. ❑ c.OTHER(Specify): 49016 <br /> p 490-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): J02° <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 49021 <br /> 49022 <br /> ❑ 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 49033 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 49034 <br /> 490-25 <br /> ❑99.OTHER (Specify): - 490-26 <br /> 490-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> ❑ I.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 49-328 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:❑a.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM 490.29 <br /> PANEL MANUFACTURER: 49030 MODEL#: 49031 <br /> LEAK SENSOR MANUFACTURER: °90-32 ) MODEL#(S): 4W-33 <br /> ___-____-_-___ <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ❑a.YES ❑b.NO 40-34 <br /> FAILUREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490-35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED(23 CCR 490.36 <br /> 7- -__ -------- ----------l- �---------------- <br /> MLLD MANUFACTU _ <br /> RER(S): KED jPcCte. 490-37 MODEL#(S): 6 D 5�0 490-36 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 49039 <br /> ELLD MANUFACTURER(S) 49040 1 MODEL#(S):___ 490-01 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.K 49042 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49043 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49044 <br /> 4.PIPE INTEGRITY TESTING 491ws <br /> TEST FREQUENCY Cl.'a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 4904649047 <br /> ❑ 5.VISUAL PIPE MONITORING. 490.,15 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED' <br /> 4h149 <br /> •Allowed for rronftorinR Ofwbwed emam enermar fuel PrPang only rHSC§25M1,5b J <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(s)(3)1. 490.50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.71S CONNECTED TO THE TANK SYSTEM <br /> 490-51 <br /> ❑ 99.OTHER(Specify) 49052 <br /> 490-53 <br /> UPCF UST-D(2/2007)1/4 <br />