Laserfiche WebLink
• STATE OFCAUFORNIA • �'`o <br /> STATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION-FORM B `� <br /> is <br /> COMPLETE A SEPARATE FORM FOR TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT 5 CHANGE OF INFORMATION 7 PERMANENTLY CLOSE NSITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ d AMENDED PERMIT 6 TEMPORARY TANK CLOSURE a 8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: G <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN /tl <br /> A OWNER'S TANK I.D.N B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MC/DAY/YEAR) D. TANK CAPACITY IN GALLONS: <br /> II.TANK C NTENTS IF A-1 IS MARKED,COMPLETE ITEM C. <br /> 1 MOTOR VEHICLE FUEL 4 OIL g. C 1a REGUI R UNLEADED 3 DIESEL ❑ 6 AVIATION GAS <br /> A ❑ 2 PETROLEUM ❑ 80 EMPTY 1 PRODUCT ❑ 10 PREMIUM UNLEADED 4 GASAHOL ❑ 7 METHANOL <br /> ❑ is MIDGRADE UNEADED 5 JET FUEL ❑ 8 M65 <br /> O 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED 99 OTHER(DESCRIBE IN REM D.BELOM <br /> 0. IF(Ai)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.tl: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A B,AND C,AND ALL THAT APPLIES IN BOX D AND E <br /> A. TYPE OF ❑ OUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR UNER ❑ 5 INTERNAL BLADDER SYSTEM ❑ 95 UNKNOWN <br /> SYSTEM 2 SINGLE WALL ❑ d SINGLE WALL IN A VAULT ❑ 99 OTHER <br /> B. TANK ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE UMINUM ❑ B 100% METHANOL COMPATIBLE W/FRP <br /> (Primary Tank) ❑ g BRONZE O 10 GALVANIZED STEEL 95 UNKNOWN ❑ 99 OTHER <br /> C.INTERIOR ❑ i RUBBER LINED ❑ 2 ALKYD LINING ❑ OXY LINING ❑ 4 PHENOLIC UNING <br /> LINING OR ❑ 5 GLASS UNING ❑ 6 UNLINED kj 95 UNKNOWN ❑ 99 OTHER <br /> COATING IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES— NO— <br /> D.EXTERIOR ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> CORROSION <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE 95 UNKNOWN ❑ 99 OTHER <br /> E SPILL AND OVERFILL,BSO. SPILL CONTAINMEW INSTALLED(YEAR( OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> DROP TUBE YES_ NO_ STRIKER PLATE YES NO_ DISPENSER CONTAINMENT YES_ NO <br /> W.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 4 FLEXIBLE PIPING A U 99 OTHER <br /> B. CONSTRUCTION AG 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEELU 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION 1 NEau+arx ld1E t£Nc 2 uxE nGHrxess 3 c6Nlwuas Ix�mimu 4 Br:cl K UNE 5 AVOWTIC ww <br /> ❑ OEIECfOR TESTING ❑ w m m LEAK DETE=R 9Rnp m ❑ 99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK 2 MANUAL <br /> INVENTORY ❑ 3 VADOZEON MONITORING ❑ 4 GAUGING C TANK ❑ 5 MONITORINGDWATER 6 ANSnAL TANK <br /> ❑ 7 <br /> CONTINUOUS MONITORING INTERSTITIAL ❑ 0 SIR ❑ 9 TANK�GAUG NGAL ❑10 TESTING Y TANK ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION(PERMANENT CLOSURE IN-PUCE) <br /> 1.ESTIMATED DATE LAST USED(MO/DAYNR) 2.ESTIMATED QUANTITY OFI 3.WAS TANK FILLED WITH YES ❑ NO F-1SUBSTANCE REMAINING GALLONS INERT MATERIAL 7 <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE,IS TRUE AND CORRECT <br /> TANK OWNER'S NAME DATE <br /> (PRINTED&SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY a JURISDICTION a FACIUTY# TANK k <br /> STATE I.D.# F37T 02 (a 1 ,5d.311 U 5 1515110 <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION UATE C J <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORMA,UNLESS A CURRENT FORMA HAS BEEN FILED. FORM C MUST BE COMPLETED FOR INSTALLATIONS. IS FORM <br /> SHOULD BE ACCOMPANIED BY A PLOT A_&E THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING TH(GROUND STORAGE TANK REGULATIONS R_ !T1 CC <br /> (6 <br /> FORM B .95) F�Na03R&'I <br />