My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2001-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
1405
>
2300 - Underground Storage Tank Program
>
PR0231485
>
COMPLIANCE INFO 2001-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2022 11:44:39 AM
Creation date
11/2/2018 3:45:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2012
RECORD_ID
PR0231485
PE
2361
FACILITY_ID
FA0000306
FACILITY_NAME
EMILS LIQUOR & SPORTS SHOP*
STREET_NUMBER
1405
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
ESCALON
Zip
95320
APN
22707031
CURRENT_STATUS
01
SITE_LOCATION
1405 CALIFORNIA ST
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CALIFORNIA\1405\PR0231485\COMPLIANCE INFO 2001-2012.PDF
QuestysFileName
COMPLIANCE INFO 2001-2012
QuestysRecordDate
5/14/2018 3:33:43 PM
QuestysRecordID
3891081
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES [I NO)( <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer the Heath and certificates r each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy y <br /> Plan" is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adclinct piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Remaye shear valve top and attampt tolEpair Replace ah ar valve if needed <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> JORMTP-5E5j7 SHEAR TOP REPLACEMENT DOUBLE POPPET OPW Male too 1-1/2' (For shear valve <br /> 10BHMP-5830). <br /> 1OBHMP-5830: SHEAR VALVE OPW Male to 1-1/2' Double Poppet, Pressure Combination Mount. <br /> (Replacement top use 10RMTP-5851) <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.