Laserfiche WebLink
SWRCB,January 2002 Page -S of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ,ping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑ Jher(Spec) <br /> Test Method Used: essure G Vacuum ❑Hydrostatic <br /> tother(Spec) <br /> Test Equipment Used:'PfesswYf e w. sZ Equipment Resolution: l 716 -15 Par <br /> Piping Run # �_ Piping Run# L Piping Run# '7) riping Run# <br /> Piping Material: ti<!6e 4"55 Fid' ,4sS i so <br /> Piping Manufacturer: 5 V i 4-In -5 <br /> Piping Diameter: 3 " 3 <br /> Length of Piping Run: rmr. 45 rw. SOI -W, 301 <br /> Product Stored: t a u S r-2f <br /> Method and location ofrrs+}pQ4-ai es b404- 00- �s4 �r <br /> piping-run isolation: 5TP ''` LSrto'µ"3 <br /> Wa between applying <br /> ressur uum/water and <br /> starting test: ) b.u u r kou ✓ ) k D a <br /> Test Start Time: I., UC) `Z : 0 0 4' od <br /> Initial Reading(R,): 5- S T $ /0 57 S /QST <br /> Test End Time: p 1 00 (01 00 10-, 66 <br /> Final Reading(RP): <br /> Test Duration: Gym V ytl <br /> Change in Reading(R,-R,): Cl 5 J <br /> Pass/Fail Threshold or i <br /> Criteria: rJ o Loss sS eJ o Los5w 45S NJ Gussw✓ 5 <br /> Test Result: Pass ❑Fail Pass ❑Fail 4tPass ❑Fail (_L Pass ❑Fa <br /> COMMents-(include information on repairs made prior to testing, and recommendedfollow-upforfailed tests) <br />