Laserfiche WebLink
Software Version Installed: 14.01 <br /> ora fete the following checklist: <br /> ® Yes ❑ No" Is the audible alarm operational? <br /> ® Yes ❑ No' Is the visual alarm operational? <br /> ® Yes ❑ No" Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ® Yes ❑ No" Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper <br /> operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.,modem)operational? <br /> ® N/A <br /> ® Yes ❑ No' For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak, <br /> ❑ N/A fails to operate, or is electrically disconnected? If yes: which sensors initiate positive shut-down? (Check all that apply) ® Sumplrrench <br /> Sensors; ®Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks pn�sensor failureldisconnection? ®Yes; ❑No. <br /> ❑ Yes ❑ No" For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e., no mechanical overfill prevention valve is <br /> ® N/A installed),is the overall warning alarm visible and audible at the tank fill point(s)and operating properly? If so,at what percent of tank capacity <br /> does the alarm trigger? 0% <br /> ❑ Yes ® No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced and list the manufacturer name <br /> and model for all replacement parts in Section E,below. <br /> ❑Yes" ® No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; ❑Water. If yes,describe causes in Section E,below. <br /> ® Yes ❑ No" Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> ® Yes ❑ No" Is all monitoring equipment operational per manufacturer's specifications? <br /> "In Section E below,describe how and when these deficiencies were or will be corrected. <br /> JEFF WONG ON SITE HAD TO ADJUST 87 LD THEN PASSED . DISP 3-4 DSL SHEER DOES NOT <br /> E. Comments: SHUT OFF FLOW <br /> 1 <br /> G <br /> Monitoring System Certification Page 2 of 4 2/21/07 <br /> F. In-Tank Gauqinq I SIR Equipment: ® Check this box if tank qauqinq is used only for inventory control. <br />