My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2001-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
1405
>
2300 - Underground Storage Tank Program
>
PR0231485
>
COMPLIANCE INFO 2001-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2022 11:44:39 AM
Creation date
11/2/2018 3:45:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2012
RECORD_ID
PR0231485
PE
2361
FACILITY_ID
FA0000306
FACILITY_NAME
EMILS LIQUOR & SPORTS SHOP*
STREET_NUMBER
1405
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
ESCALON
Zip
95320
APN
22707031
CURRENT_STATUS
01
SITE_LOCATION
1405 CALIFORNIA ST
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CALIFORNIA\1405\PR0231485\COMPLIANCE INFO 2001-2012.PDF
QuestysFileName
COMPLIANCE INFO 2001-2012
QuestysRecordDate
5/14/2018 3:33:43 PM
QuestysRecordID
3891081
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
❑ Check this box ff no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No' Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No' Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No' Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No' Were all probes reinstalled properly? <br /> ❑ Yes ❑ No' Were all items on the equipment manufacturers maintenance checklist completed? <br /> •In Section H,below,describe how and when these deficiencies were or will be corrected. <br /> Llne Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> S Yes ❑ No' For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br /> ❑ N/A Simulated leak rate: S 3 9.Oh.; [10.1 g.p.h; [10.2 g.p.h. <br /> S Yes ❑ No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> S Yes ❑ No' Was the testing apparatus property calibrated? <br /> S Yes ❑ No' For mechanical LLDs,does the LLD restrict product Flow if it detects a leak? <br /> S N/A <br /> ❑ Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> S N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> S N/A <br /> LOYessElNo' For electronicLLDs,does the turbine automatically shut off rf any portion of the monitoring system malfunctions or fails a test? <br /> S N/A <br /> s ElNo' Forelectronic LLDs,have all accessible wiring connections been visually inspected? <br /> N/A <br /> ❑ No" Were all items on the equipment manufacturers maintenance checklist wmpleted? <br /> In Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> 87140 3 28 21 PASS <br /> 91 160 4 26 12 PASS <br /> DSL 140 3 15 12 PASS <br /> Monitoring System Certification page 3 of 4 2/21/07 <br /> Monitoring System Certification <br />
The URL can be used to link to this page
Your browser does not support the video tag.