Laserfiche WebLink
SWRCB,January 2002 Page_of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard X Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:Caldwell Level Change Indicator Equipment Resolution: .002 <br /> Sump#1 Sump#2 Sump#3 Sump# <br /> Sump Diameter: 42" 42" 42" <br /> Sump Depth: 54" 51" 54" <br /> Sump Material: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 13" 17" IS" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 14" 15" 15" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry Dry <br /> Portion of Sump Tested' Water Line 18" Water Line 19" Water Line 18" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes Yes Yes <br /> roduct and water? <br /> Turbine shutdown response time Not Alarmed Not Alarmed Not Alarmed <br /> Is system programmed for fail-safe Yes Yes Yes <br /> shutdown?' <br /> Was fail-safe verified to be No No No <br /> operational?* <br /> Wait time between applying water <br /> and starting test: 5 Minutes 5 Minutes 5 Minutes <br /> Test Start Time: 8:15 8:20 9:05 <br /> Initial Reading(R,): .001 .001 .001 <br /> Test End Time: 8:45 8:50 9:35 <br /> Final Reading(RF): .001 .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes 30 Minutes <br /> Change in Reading(RF-R,): 0 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes .005/30 Minutes <br /> Test Result: X Pass ❑Fail X Pass ❑Fail X Pass FailAFINo <br /> Was sensor removed for testing? X Yes ❑No ❑NA X Yes ❑No ❑NA X Yes —No LINA []YesWas sensor properly replaced andX Yes ❑No ❑NA X Yes ❑No ❑NA X Yes ❑No ❑NA <br /> verified functional after testin ? <br /> Comments—(include information on repairs made prior to testing, and recommended ollow-up orfailed tests) <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />