Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- (Page 1 of 2) <br /> TYPE OF ACTION ❑ 1.NEW PLAN 2.CHANGE OF INFORMATION °90-1. <br /> PLAN TYPE 1rl.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 4902 <br /> (Check one item only) ❑ 2_THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S)- <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 1. <br /> BUSINESS NAME(Same as Facility Nameor DBA) 3 <br /> 37- o Edi• L A)r - <br /> BU IN S SITE PDRE /. 103. CITY <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)most be performed at the frequency specified <br /> by the equipment manufacturers'instructions..or annually,whichever i more frequent..Such work must be performed 63'qualified personnel.123 CCR§2632 2634.26.3.8,26411 <br /> MONITORING EQUIPMENT IS SERVICED YIANNUALLY ❑ 99.OTHER(Specify): 400-36. <br /> III. MONITO G LOCATIONS <br /> L NEW SITE PLOT PIAN/MAPSLIRMI I TFI)WTI"H'fHIS PLAN 2_SITFPIOTPI,AN/MAIIPREVIOUSI.YSUBMI"FEED JB0-4' <br /> ❑ [n CCR§z63A x6341 <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (h aekrl <br /> I <br /> 1,CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS ID CCR§202,26341 <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY &(b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-6 <br /> PANEL MANUFACTURER: O 490'9, MODEL#: S 490-8. <br /> LEAK SENSOR MANUFACTURER: EOL'-/dS 0&z 490-9. MODEL#(S): S'%Dg _490-10- _ <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SI GLE WALL TANK(SL ID CCR§x643] 490-n <br /> PANEL MANUFACTURER: 490-11 MODEL#: 490-13_ <br /> IN-TANK PROBE MANUFACTURER: 490.14. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILYINIGHTLY ❑ c.WEEKLY 490-16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-1' <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h ❑ R ci 490-16. <br /> _. _ BSPg.p.h. C.OTHER S_ _- _- - - �R �'$ 90-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2M&,]] 490-20. <br /> ❑ 4 WEEKLY MANUAL TANK GAUGING(MTG)123 CCR§2645] TESTING PERIOD ❑ a.36 HOURS ❑ b 60 HOURS 4904-30-21. <br /> _ _._... --.._____- ___.._.-.._._..____- ___ _______. ...___-. ______-_ <br /> 11 <br /> ❑ 5.TANK INTEGRITY TESTING PER(23 CCR§2643.1] 4%-23 <br /> TEST FREQUENCY: ❑ a.ANNUALLY [Ib.BIENNIALLY E] c.OTHER(Specify): 490 z0-z4. <br /> ❑ 99 OTHER(Specify): 490-26 <br /> 490-27 <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) ycaheack all <br /> I.CONTINUOUS MONITORING OF PIPE/PIPIN SUMP(S)AND OTHER SECONDARY CONTAINMENT WI IIF AUDIBLE&VISUAL ALARMS. 4%26 <br /> 1§26361 SECONDARY CONTAINMENT 1$: Ip a.DR/Y4. ❑ bfLIQ�D F14yEp ❑ c.PRESSURIZED ❑ d.UNDER VACUUM °9°-0-9. <br /> PANEL MANUFACTURER: AEAe' 4ERT/O F�/Y.SC/_/� 9°-3° MODEL#: O S6oan <br /> LEAK SENSOR MANUFACTURER: ✓�F-GA MODEL#(S): <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ❑ a.YES .NO °4, <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. Ela.YES �.NO 49x35. <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR(MELD)THAT ROUTINELY PERFORMS 3.0&p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36 <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.ID CCR§26361 <br /> MLL_D MANUFACTURER(S): 990.31 MODEL#(S): 490-38. <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.ID CCRI2061 490-39_ <br /> ELLD MANUFACTURER(S): 490.40. MODEL#(S): 49041. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 490'41 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 49043. <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b NO d90.°°-Nj - <br /> 4.PIPE INTEGRITY TESTING , 49045. <br /> TEST FREQUENCY &(a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 0-q 0l <br /> 5 VISUAL PIPE MONITORING. 490'°8, <br /> FREQUENCY: V.DAILY ❑ b.WEEKLY ❑ C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED. 49 19. <br /> „_,.-_-__!_AII w %r moniron g f b_atemergenrygmeraror fuel Aping aN,�per HSC§252815(b)(3)_. <br /> 6 SUCTION PIPING MEETS EXEMPTION CRITERIA.ID CCR§2636()(3)) 490-50. <br /> ___--... _.... ....-.. -..__.___._-. __-._..__. _._.___-__- ___._. _..-__.__.__ .. _._.__.__- _. <br /> ❑ 7.NO REGULATED PIPING FER HEALTH AND SAFETY CODE DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM 490-51. <br /> ❑ 99.OTHER(Specify) completed <br /> mn n A 4 49 51 <br /> UPCF UST-D(I2/2007)-1/4 www.unidocs.org 1 011 pleted <br /> � YYY 1 1Y <br />