Laserfiche WebLink
30 November 2010 <br /> AGE-NC Project No. 10-1821 <br /> Page 4 of 7 <br /> 6.0. ON-SITE WORK PLANS <br /> Work party(ies) consisting of two persons will perform the following tasks: <br /> PROJECT TEAM LEADER: TASK: <br /> To Be Determined Site safety officer, direct work activity <br /> FIELD CREW: TASK: <br /> Rinse/Collect/Removal Piping Digging, grouting <br /> 3rd Party sampler Collect samples <br /> The works party(ies) shall be briefed on the content of this plan prior to initiating onsite <br /> work. <br /> 7.0. COMMUNICATION PROCEDURES <br /> If hearing is impaired, the following standard hand signals will be used: <br /> Hand gripping throat: Out of air; can not breath <br /> Grip partner's wrist or both hands around Leave area immediately <br /> waist: <br /> Hands on top of head: Need assistance <br /> Thumbs up: OK; I am alright; I understand <br /> Thumbs down: No; negative <br /> 8.0. EMERGENCY MEDICAL CARE <br /> St. Joseph's Medical Center is located at the site. Entrance is approximately 500 feet <br /> from the work area. <br /> Local ambulance service is available at phone 911. Their response time is 5 minutes. <br /> Advanced GeoEnvironmental,Inc. <br />