Laserfiche WebLink
8. a Describe the method that will be utilized tog and/or inert the (s): S' <br /> b. Tank/Piping <br /> gHHauler:T <br /> Name CJz,?i //��21E& O/C /,v�G <br /> Address <br /> 3 S 7 n), % city-4C� i zip sor `a <br /> Phone No.(ZLC�—) <br /> Hauler Registration#(if hauled as hazardous) <br /> C. Tank/Piping <br /> Disposal Site: <br /> Name J G/rn�/ / <br /> /Z�:JCNO <br /> Address—/1Q2 0620 ©l�'I/ City fy4lJOd� Zip 7 <br /> Phone No. / �n o <br /> EPA ID# (if transported to a permitted TSD facility) <br /> 9. Is the sampling firm an independent third party Lrom the contractor? YES< NO [] <br /> 9a. Describe in detail,how the soil and/or water sample(s)beneath the tank and piping will be obtained: <br /> G <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal• <br /> >�S"!' >�� /zl e✓��/` Cdr-��fT,✓� <br /> 11. Handling of excavated soil: <br /> a)What material will be used to line the tank pit and cover the stockpile? <br /> b)What will be the final destination of the excavated stockpile? <br /> c) Contaminated Soil Hazardous Waste Hauler. <br /> Name ��7`� m �,z C- Hauler Registration <br /> Address � <br /> 7 �Ec1la��� cis �o/J% zip 9�2 � <br /> Phone No. <br /> EH 23 046 (Revised 3/15/02) Page 5 <br />