My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
2315
>
2300 - Underground Storage Tank Program
>
PR0231032
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2024 2:23:43 PM
Creation date
11/2/2018 3:51:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231032
PE
2381
FACILITY_ID
FA0004062
FACILITY_NAME
VOGUE CLEANERS
STREET_NUMBER
2315
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12538016
CURRENT_STATUS
02
SITE_LOCATION
2315 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CALIFORNIA\2315\PR0231032\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
2/2/2012 8:00:00 AM
QuestysRecordID
123577
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA ` <br /> STATE WATER RESOURCES CONTROL BOARD p <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION- FORM B <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLO <br /> ONE ITEM ❑ 2 INTERIM PERMIT 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ B TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: Q 6a 4r— C G6�,YNW <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-SPECIFY IF UNKNOWN <br /> A. OWNERS TANK I.D.# /0-3 Z _, B. MANUFACTURED BY: u <br /> C. DATE INSTALLED(MOIDAYNEAR) D. TANK CAPACITY IN GALLONS: <br /> II.TANK CONTENTS IF AA IS MA RKED,COMPLETE ITEM C. <br /> A. 1 MOTOR VEHICLE FUEL 4 OIL B. C. ❑ 1-UN EADEO ❑ 3 DIESEL ❑ 6 AVIATION GAS <br /> PETROLEUM ❑ 00 EMPTY ❑ 1 PRODUCT ❑ 1b PREMIUUNLEADED ❑ 5 JETFUEL ❑OL 7 METHANOL <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE 2 LEADED 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED. ENTER NAME OF SUBSTANCE STORED C.A.S.# <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.B.ANDC,AND ALLTHAT APPLIES IN BOXD ANDS <br /> A. TYPE OF ❑ 1 DOUBLE WALL 3 SINGLE-WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> B. TANK 1 BARE STEEL F72 STAINLESS STEEL F-] 3 FIBERGLASS E] 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL �❑ 5 CONCRETE ❑ 8 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (PrimaryTank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING { 6 UNLINED F-195 UNKNOWN ❑ 99 OTHER <br /> LINING I4 <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NO— <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION N <br /> 91 NONE ❑95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) GIVERFICL PREVENTION EOUIPM ENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND.BOTH IF APPLICABLE <br /> A. SYSTEM TYPE An 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION Aigi SINGLE WALL A U 2 DOUBLE WALL A U 3 LINEA TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND Ae)1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W6RP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ MONfTORING ❑ 99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ i VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING O 5 GROUND WATER MONITORING <br /> ❑ 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING �91 NONE ❑ 95 UNKNOWN L] 99 OTHER <br /> VI.TANK CLOSURE INFORMATION vv--''�� <br /> 1.ESTIMATED DATE LAST U E (MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH <br /> SUBSTANCE REMAINING __GALLONS INERTMATERIAL? YES ❑ NO <br /> THIS FORM HAS BEEN COMPLETE UNDER PENALTYgE PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME <br /> (PRINTED 8 SIGNATUREI DATE <br /> LOCAL AGENCY UW15LY THE STATE I.D.NUMBER IS C010VOSED OFTHE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY n49ON91p-2- TANK#(5)0iL STATE I.DA m 3 C7 Z <br /> PERMIT NUMBER PER MIT APPROVED BY/DATE PERMIT EXPIRATION DATE � I� <br /> FORM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED L <br /> ` - FOROGNIIHI5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.