Laserfiche WebLink
\r NEW <br /> IIOARO OF TRUSTEES SAN JOAQUIN LOCAL HEALTH DISTRICT SERVING <br /> James Culbertson, Pros. City of Lodi <br /> Patricia tt Vannuccl. Secy. 1601 East Hazelton Avenue, P. O. Boz 2009 San Joaquin County <br /> EarlAntPI eels Ven Spronsen City of Escalon <br /> Earl Plmenlel Stockton, California 95201 City of Manteca <br /> Fern Bugbeel L. Flo 209/466-6281 City of Ripon <br /> Daniel L. Flores City of Stockton <br /> John 0, Mast, M.D. City of Tracy <br /> William J. Wade Jopl Khanna, M.O., M.P.M., District Health Officer San Joaquin County <br /> Mary Anna Love San Joaquin County <br /> Facil i ty Name Unaye- e. Ica-nye 5 <br /> IV <br /> Address o�3 15� r C ct 11-OCn fa _ —"FbG k4y e7 <br /> Date of Inspection 6' 3� `�$_ Inspector _ hor?Y70. H&ran <br /> MONITORING ALTERNATIVE 87 <br /> Limited to undern.round storage tanks which have infrequent inputs and withdrawals and <br /> where the ligltic: level in the tank can be measured to an accuracy of +5 gallons or less <br /> when the tank is half full . <br /> This monitoring alternative shall include: <br /> L"/Annual precision test on tank and piping. <br /> __X.Z(ank gauging performed as follows: <br /> Tank must be capable of being secured to prevent unauthorized inputs and <br /> withdrawals. <br /> `�Tank must have no inputs or withdrawals for at least a 48 hour period <br /> (2 days) at the end of consecutive periods lasting up to 7 days. <br /> (For example: tank in use Monday through Friday, then locked <br /> over weekend) . _ <br /> Liquid level measurements are taken at the beginning and end of the <br /> monitoring period (lasting at least 48 hours). <br /> (For example: level measured and recorded Friday night before <br /> / locking and again on Monday morning before opening. ) <br /> VIf liquid level varies more than 1% of the tank volume or 5 gallons, which <br /> ever is less, between measurements, an unauthorized release shall be <br /> assumed to have occurred and shall be reported to the local agency within <br /> 24 hours, as per Article 5, Sect. 2652 of the regulations and further <br /> evaluations shall be performed to verify or disprove the variations. <br /> Implementation of the monitoring alternative requires that the following circled items be <br /> completed by the dates specified. <br /> 1 . Precision test(s) must be performed by 7 5 $band results submitted to this <br /> office within 30 days of the test. <br /> 2. Tank gauging must be started immediately. (See instructions above). <br /> If the above compliance dates cannot be met, contact this office prior to the specified <br /> date. <br /> 4/86 UGT 3 <br />