My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1994
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
240
>
2300 - Underground Storage Tank Program
>
PR0501503
>
REMOVAL_1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:50 AM
Creation date
11/2/2018 3:52:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1994
RECORD_ID
PR0501503
PE
2381
FACILITY_ID
FA0005125
FACILITY_NAME
GRAND AUTO #34
STREET_NUMBER
240
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13925006
CURRENT_STATUS
02
SITE_LOCATION
240 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CALIFORNIA\240\PR0501503\REMOVAL 1994.pdf
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOA©UIN COUHt- .- .r <br /> COMMUNITY DEVELOPMENT DEPA11t•MENT <br /> T 1510 t 1UlZRIC01 AVE,51OCKIOR CA 95205 <br /> OEVE O!"Efff SEnVECf9 111011F_•12091 160.3120 <br /> PlAFROIC 1110f,E:12091 4611-3070 <br /> f"1111KI f'I1(k1t:12091 460 312.1 <br /> 11-0 90811©00 PnESEnvA110Fl P1 101*--12091 460-3021 <br /> BACKFILL EXCAVATION CERTIFICATU <br /> Project Loca Llorl Grand Auto Store 240 N. California St. Stockton, CA 95202 <br /> Owner Ray Farmer i'11v1Ie 110. (209)952-3260 1 <br /> Corftr:actor Jim Thorpe Oil, Inc. 1,11or1e No. (209)368-6175 Llcerlse No. +95699 <br /> 111DICATE HETROD OF r1ACKFILL QUALITY ASSURAIICH <br /> 1 . Submission of Soil Engineer's Compaction Report within 30 days of project <br /> comptntion, or <br /> 2. Submisslon of verification, e.g. load ticket, within 30 days of project <br /> completion that one of the following materials was placed In the excavation In <br /> 12" luta: <br /> X A. Pea gravel - smooth, rounded material not more than one--half 112) <br /> inch In diameter. <br /> B. Crushed sock - sell-compacting material not more than three-quarters <br /> (3/ 1) inch In cross sectional measurement. (Use of crushed rock <br /> will not be permitted for backfill if contact will be made between 1 <br /> the backfill material and tanks/pipes made of poly resin glass or <br /> similar materials. ) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days <br /> of project_ completion, or submission of verification that the select material described above <br /> w1.11 be pl.nced at a minimum or flee (5) cubic yards per 1000 gallon tank displacement and <br /> that the enttre excavntlon will he backfilled and compacted to insure compliance with the <br /> Uniform Building Code Appendix chapter 70. <br /> Jim Thorpe Oil, Inc./Contractor <br /> A Richard •rhor e <br /> Vame (Pr r1t) <br /> President <br /> AS M(print) <br /> iglia L4Ur <br /> t Shall be Lhe responsible maliagirfy employee on the license or authorized <br /> agent. <br /> /41-LC/BECERT.D0C <br />
The URL can be used to link to this page
Your browser does not support the video tag.